Laserfiche WebLink
DDRW-TRACY OU#1 PROPOSED PLAN <br /> Preferred clean-up method is pump and treat TCE/PCE contaminated <br /> groundwater (same as IRM) w-A c <br /> • Expand IRM to address off-base and deeper on-base groundwater <br /> • Estimate 30 years to clean-up TCE/PCE contaminated groundwater off-base <br /> and on-base <br /> • Public comment 30 December 1992 through 28 Jan 1993 (p. 2 fact sheet) <br /> DDRW - TRACY PROPOSED PLAN <br />