My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B 2_ <br /> MONITORING AND REPORTING PROGRAM <br /> GENERAL ORDER FOR LAND DISPOSAL <br /> OF GROUND WATER FROM CLEANUP OF <br /> PETROLEUM FUEL POLLUTION <br /> GROUND WATER MONITORING <br /> Prior to construction, plans and specification for ground water monitoring and/or <br /> extraction wells shall be submitted to the Board staff for review and approval . <br /> Quarterly reports are required in Section 2652(d) of the Underground Tank <br /> Regulation, Chapter 16, Division 3, Title 23, of the California Code of <br /> Regulations. Recommended reporting formats are included in the Tri-Regional <br /> Recommendations and Appendix A. Ground water monitoring results, volumes of <br /> extracted ground water and product, and remediation system operational <br /> information must be included. <br /> REPORTING <br /> In reporting the monitoring data, the Discharger shall arrange the data in <br /> tabular form so that the date, the constituents, and the concentrations are <br /> readily discernible. The data shall be summarized in such a manner to illustrate <br /> clearly the compliance with waste discharge requirements. <br /> 90 days after the issuance of this Order, the discharger shall supply Board staff <br /> with a ground water monitoring program that will demonstrate the effectiveness <br /> of the ground water treatment system. <br /> Annually, by 30 January, the discharger shall submit a report evaluating the <br /> effectiveness and progress of the ground water cleanup, including at a minimum: <br /> both tabular and graphical summaries of the monitoring data obtained during the <br /> previous year; trends in the concentrations of the pollutants in ground water <br /> monitoring wells; whether the contaminant plume is being captured by the <br /> extraction system or is continuing to spread; plans for improvements to the <br /> ground water monitoring, extraction or treatment system; status of any other <br /> cleanup activities such as soil excavation or soil venting systems; and the <br /> anticipated date for completion of cleanup activities. The annual report shall <br /> also include the reasons for and durations of all interruptions in the operation <br /> of the treatment systems. <br /> Quarterly monitoring reports shall be submitted to the Regional Board by the 15th <br /> day of the following month after the calendar quarter. <br /> The results of any monitoring done more frequently than required at the locations <br /> specified in the Monitoring and Reporting Program shall be reported to the Board. <br /> Upon written request of the Board, the Discharger shall submit a report to the <br /> Board by 30 January of each year. The report shall contain both tabular and <br /> graphical summaries of the monitoring data obtained during the previous year. <br /> In addition, the Discharger shall discuss the compliance record and the <br /> corrective actions taken or planned which may be needed to bring the discharge <br /> into full compliance with the waste discharge requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.