My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
guidance. <br /> 3 . Page 4-1, Section 4.0.0 <br /> It should be clarified that a remedial action goal can be <br /> protective of either human health or the environment, and is <br /> not necessarily restricted to human health only. <br /> 4 . Page 4-1, Section 4. 0. 0 <br /> It should be clarified that the human health risk assessment <br /> does not determine whether there are or are not health <br /> risks, but instead determines the level or probability of <br /> potential risks. Risk managers then decide the level of <br /> risk that is acceptable and make remedial decisions based on <br /> that determination. The determination that there are no <br /> risks is a risk management function and not a risk <br /> assessment function. <br /> 5 . Page 4-1, Section 4. 0.0 <br /> The second to last sentence should read " . . . impacts of <br /> contaminants from the depot. . . . " <br /> 6. Page 4-2, Section 4 . 0.3 <br /> First bullet should read " . . . actual or •potential effects. <br /> n <br /> 7 . Page 4-4, Section 4 . 1. 1 <br /> The current work plan is supposed to be the "detailed risk <br /> assessment plan" . These are not provided in the current <br /> work plan. DDRW-Tracy has not met the requirements of the <br /> FFA in this Work Plan. <br /> 8 . Page 4-4, section 4.2 <br /> Since source migration pathways are identified in the <br /> current plan, could have been a preliminary model of <br /> exposure pathways developed. <br /> 9. Page 4-5, Section 4.2.3 <br /> The concept of evaluating site-related health risks by <br /> breaking the site into smaller units appears to be an <br /> acceptable approach to this site. However, the units <br /> identified in this plan do not appear to have been developed <br /> with a clear sense of the possible exposures at the site. <br /> For example, the SWMUs are to be evaluated as a single unit <br /> according to the plan. However, the SWMUs are both <br /> chemically and geographically diverse and would be better <br /> II-2 l <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.