My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W TE*o . <br /> A1010 , 92 12 :40 NO - 009 P . 02 <br /> FACILITY: Uefense Distribution Region West, Tracy <br /> LOCATION: Tracy <br /> CONSULTANT: 1T Corp. <br /> PROPOSAL DATE: Remedial Action at Building 201 <br /> 29 January 1992 <br /> [x] 1 Monitoring Well(s) <br /> [X] 8 Soil Boring(s) <br /> [ Soil Excavation(s) Depth <br /> We have reviewed the above proposal concerning the above check items and the <br /> proposal is acceptable. <br /> Based on conversations with IT Corp. representatives (Chris and John) on 8 April 1992, <br /> our outstanding concerns regarding theinstallationof the soils borings were resolved. <br /> Date: 10 April 1992 Staff Signature: 6 <br /> Monitoring well to be screened (15 feet) across uppermost water bearing zone, with five <br /> feet of screen above the ground r <br /> water <br /> 9 table. <br /> Soil borings to be installed to ground water table. Four borings to be installed <br /> initially. Boring directly to north is unnecessary (samples From trench were ND) . <br /> Four additional borings to be installed based on field information (initial borings) <br /> to delineate extent of contamination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.