My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Again, it will be necessary to revise the alternatives under <br /> consideration in Section 4 to reflect the changes made in <br /> Section 3 . <br /> Modify Section 4 to reflect the changes to the <br /> alternatives in Section 3 . <br /> 52 . Table 4 . 2-2 , Page 1 <br /> Annual operations and maintenance (O&M) labor hours for the <br /> collection system and extraction wells would be expected to <br /> increase from alternative 1 to alternative 2 when the number <br /> of wells increases from 6 to 17 . <br /> • Please explain the lack of change. <br /> 53 . Table 4 . 2-2 , Page 2 <br /> Annual O&M labor hours for the injection system and <br /> injection wells would be expected to increase from <br /> alternative 1 to alternative 2 when the number of wells <br /> increases from 3 to 6. <br /> Please explain the lack of change. <br /> 54 . Table 4 . 2-3 , Page 1 <br /> It seems unlikely that the pump system for 28 additional <br /> injection wells would cost the same as the pump system for 3 <br /> additional injection wells. <br /> Please verify this apparent discrepancy between Tables <br /> 4 . 2-2 and 4 . 2-3 . <br /> 55. Table 4 . 2-3 , Page 2 <br /> Annual O&M labor hours for the collection system and <br /> extraction wells would be expected to increase from <br /> alternative 1 to alternative 3 when the number of wells <br /> increases from 6 to 34 . <br /> • Please explain the lack of change. <br /> 56. Table 4 . 2-3 , Page 2 <br /> Annual O&M labor hours for operating and supervising the <br /> treatment system would be expected to increase from <br /> alternative 2 to alternative 3 when the number of air <br /> strippers increases from 1 to 2 . <br /> Please explain the lack of change. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.