Laserfiche WebLink
Well Abandonment Work Plan -5- 16 December 1991 <br /> DDRW, Tracy <br /> water per sack of Type I cement (46 percent water) should be mixed <br /> together. Care should be taken to assure that the slurry is not mixed with <br /> excessive water as the integrity of the hydrated cement will be <br /> compromised. <br /> Page 5-2. The Plan indicates that the cuttings will be analyzed for a host of <br /> potential contaminants to determine the proper method of disposal . The <br /> cuttings need only be analyzed for halogenated hydrocarbons because these <br /> constituents are the contaminants of concern. Analyses for other <br /> constituents may be unnecessary. <br /> CKW:cw <br />