My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRM Prove-Out Reports -6- 29 August 1991 <br /> DDRW, Tracy <br /> g. The scales presented on the cross-sections are unconventional and are often <br /> confusing. For example, A-A' depicts the distance between IW-3 and MW-8 as <br /> 100 feet and the distance between IW-3 and MW-7 as about 20 feet. However, <br /> IW-3 and MW-7 are not necessarily 20 feet apart and IW-3 is a projection onto <br /> A-A' . The cross-sections need to be revised to clarify the horizontal and <br /> vertical scale. <br /> It should be noted that I tried to compare the cross-sections B-B' and D-D' which trend <br /> along the northern boundary of the site with the cross-section D-D' (Figure 3.4-5) from <br /> the RI/FS Report, which also trends along the northern boundary of the site. However, <br /> because there is no reference on the cross-sections to the wells installed by the <br /> different contractor, I could not make the comparison. Tracy needs to provide a better <br /> system for the exchange of information between the different contractors for the IRM <br /> and the RI/FS so that all available information can be used in the design of the final <br /> ground water remedial action. <br /> CKW:cw <br />
The URL can be used to link to this page
Your browser does not support the video tag.