My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jim Pinasco <br /> Page 7 <br /> August 1 , 1989 <br /> - Hydraulic conductivities derived from slug tests should <br /> be used with caution because the test may measure only the <br /> permeability of the filter pack and borehole wall of <br /> the well . <br /> The units in some of the columns are mislabeled. The <br /> table shows transmissivity as being gallons per day per <br /> square foot, and hydraulic conductivity as being gallons <br /> per day per foot. The hydraulic conductivity should <br /> have been reported in gallons per day per square foot, <br /> and transmissivity in gallons per day per foot. <br /> Comment 15 (Groundwater Flow Rates) <br /> On page 3-37, the Draft RI/FS states that the velocity of <br /> groundwater is estimated to be approximately 130 feet per year <br /> using a hydraulic conductivity of 30 feet per day. The <br /> estimate of groundwater velocity of 130 feet per year may be <br /> too low. Clarification is requested because using the <br /> hydraulic conductivity values from the constant discharge <br /> pumping tests, TSSU has calculated that the groundwater <br /> velocity ranges from 48 to 560 feet per year. <br /> Comment 16 <br /> The Draft RI/FS states the following on page 5-22 , paragraph <br /> 5. 3 . 3 . 3 : <br /> "The retardation factors for TCE and PCE (assuming a <br /> fractional organic carbon content of Upper Tulare HSU to <br /> be 0 . 005, bulk density of 1. 6 g/cc and Koc values of 250 <br /> and 42 , respectively) are 2 . 3 and 8 . 6 , respectively. <br /> Thus, TCE and PCE plumes are expected to move at about <br /> 50 ft/yr and 15 ft/yr, respectively. " <br /> TSSU interprets that the TCE and PCE may be moving at a higher <br /> velocity than quoted above due to possible higher groundwater <br /> velocities than those used in the above quotation. <br /> Comment 17 <br /> The well as-builts diagrams do not show centralizer locations <br /> on the monitoring well as-built diagrams. Centralizers should <br /> have been installed on the monitoring well casing and well <br /> screens to aid in keeping the casing and screen centered in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.