Laserfiche WebLink
Jim Pinasco <br /> August 8, 1988 <br /> Page 2 <br /> The DHS should be given the opportunity to review the proposed <br /> well designs before a drilling contract is awarded. Items of <br /> concern in these well designs include borehole and casing dia- <br /> meter, centralizer placement, casing material selection, filter <br /> pack and screen slot size, grout composition, and grouting <br /> technique. <br /> cc: David Wang <br /> Lou Beck <br /> A:RLBDDTC3 . 088 <br />