|
QW47-Tracy Document Delivery
<br /> FFA Schedule '
<br /> ...
<br /> gum
<br /> RS Annual Monitoring Progam Po n,5-... 20 Dec of -
<br /> nw+Y 60 days RS I8 Feb of
<br /> Report each year each Year fbOdoing 30 days 3lnday 45 days following 4th Quancr remits P-1idW and the annual
<br /> recei tof following renew period remits ofthe long-term monitoring proyaln
<br /> P
<br /> 2. All Sires WaterMmiaeement Report "on n,6 IS-Dec-00 R32 60 days n,6
<br /> 28-Feb-01 R submission evaluated.
<br /> 28-Aag-OI R13 60days R6 27-09t-OI R6 27-Oct
<br /> R12 -0I Plurte capture evaluatio0.eeated water
<br /> RS
<br /> R12 R12 R 2 disposal Cinders,and other water
<br /> menagarmit issues Draft fatal report to
<br /> Ria RI3 address data gaps identified in the draft
<br /> �. All Sites Basewnde Fits-Yam Review n,4 01-Dec-04
<br /> Report Inimary 60 days R4 29-len-05 R4 15-Mar-05 30 days R4 14-A -05 n,4 1q.
<br /> P< Apr-05 Requved when residual mntarnination
<br /> above umestrimed use levels reenlist in
<br /> 4. All Sites Prelvmnary Close-Ou[Report lace.
<br /> Primyy R5 3l-Dec-02 R3 60 days R3 01-My-03 n,3 it-filar-03 n,3 30 days n,3 30-Apr-03 R3 30-
<br /> RS RS R5 NS R5 R5 Apr-03 acepmedeller all doa:acraalbeit reports
<br /> an camplm<.This documevt briefly
<br /> earman"M all actions ne the site,mcluding
<br /> NFA rem01113,remedial actions
<br /> institutional controls,long-term md.ito in&
<br /> All Sites Close Out ReportPrimary as It is intended to notify the aarnei,s dia •
<br /> THD 60 days TBD THD 30 days TBD .
<br /> TBD Fine)close out report d0eumentin¢thy ad]
<br /> ROD requirereems have been fulfilled
<br /> Amu.]date to be deterrmved based on
<br /> ti. All Sitesfirmation ofachievbrg ROD cleanup
<br /> RS NPL Relisting Package P^na7 n,5 con
<br /> THD R5 60 days n,5 TBD RS
<br /> TBD RS 30 days RS TBD RS THD Actual date to be determined based on
<br /> 7. OU I Goundwarer agency approval ofthe Final Closeout
<br /> First Quarter Well hlookoring Secondap Report.
<br /> R rt 7 May ofeach 30 days b June oC 61une ofeach
<br /> 8. OU 1 Grouvdwarm 1st Quane'review 0fremlts from the lone.
<br /> Second Quarter Well Secondary ` .t
<br /> M nit rin Re rt 7 August of 30 days b Sep of each 6 September of 2nd Qmrttt review ofremlts fmm the long-
<br /> 9. OU 1 Gowdwater Fourth Quarter Well Secondary v e
<br /> ii 7 February of JO days 9 Match of 9 March ofeach 4th Quarter review ofremlts from the long-
<br /> l0. OU 1 Gouvdwater Drag yid Draft Final Designs' primary R3 03-Nor-0O R3 eaz ° en
<br /> (Peniddes) 60 days n,3 02Jan-01 n,3 26-Jun-01 R3 30 da it r
<br /> Construction QA/QC Plan RS R5 R3, Ys n,3 26-fu1-01 n,3 26-Jul-01 Drewings,speciftcations design anal
<br /> (Construction RA Work Plan) n,6 n,6 Rb n,6 FIS R5 R6 IRS confirmation samplingramessme M
<br /> R6
<br /> I I. OU I Groundwattt R12 R12 R12 R12 Mquirronal plain,and coanmenon QA/QC
<br /> Re 1 nal Actio.R Interim Pdrnary 18-Apr-01 60 days 17-Jun-01 rete backmits
<br /> Remedial Actio.Report 16-Aug-0i 30 days IS-Sep-01 15-Sep-0111 Sire back ound;
<br /> � H su®lerize remedial aetiov
<br /> and construction activities;document costs;
<br /> document whoology parte'®ce;protide•
<br /> operational and functional emlusuon;
<br /> describe post-cgn niefion rreintboane,
<br /> xtivitie%inspection certification,and
<br /> 12. SVE Sites SWMU SVE System evaluate Progress In meeting ROD
<br /> ( Opnrmranon Pnmyy n,3 26-1u1-02 n,3 60 days R3 24-5 02 R3 18-
<br /> I/Area 2,Area Work Plan R6 eP- 18 -02 n,3 30 days n,3 18-Nov-02 n,3
<br /> I/BuArea
<br /> 3,SWNf7, n,6 n,6 n,6 R6 R6 18-Nov-02 The Ciperme for opts SVE system evaluation
<br /> Area 3,S WAN R12 R12 R12 R12 R6 and scheme for optimal operation
<br /> 20/S8204)and R12 presentation.
<br /> Biomling Site
<br /> 131111-1.
<br /> 13. SVE sites(SW'MU Remedial Action Report Notary R3 30-Nov-02 R3 60 dery n,3 29-
<br /> I/Area 2.Arae 1en-03 R3 15-Mar-03 R3 30 days R3 15-A -03 R315 -03 Site
<br /> beck
<br /> 1/Building237. IS' gourd;dowrentNat ROD
<br /> Area 3,SWAN cleanup standards are achieved,summa e,,
<br /> 20/SB204)and remedial action and cmmmummu activities;
<br /> Bioventing Site document costs;decanter,taehnology
<br /> SWMU 24 Penetrable;describe pon-el inaction
<br /> maintenance activid"t inspection and
<br /> completion certification,including ROD
<br /> final doammts will be sinbm,fed with.':mal" rrilttla to be met,
<br /> tr,j and late pence,
<br /> i
<br /> ^H
<br /> no canments aro receiveti by iM1e and C me d2h foal reNew OedW,Ire dammed[w+ll be considered fnall.
<br /> MIMI
<br /> wrrlu mm
<br />
|