My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MC-Tracy Document Deltyery y S <br /> FFA Schedule <br /> �y, <br /> �, . , i. .,;'"1`r`' r .E k:,, will, <br /> 23. SWMUs 2.3.7,31 R7 SWMU 4 Ecological Risk Secondary R7 22-Sep-011 R7 30 days R7 23-(Jct-00 R7 Ne R7 we R7 We R7 04-Dec-00 Will W aced to develop and help mmptdrrhe <br /> (DSERTS 65),DSA Assessment Ra Rg RN RA draft farl FSU.1vust are draft rd Ma&d <br /> Bldg JO(DSERiS <br /> R9 RIO d�Per 0.PM a®eweem <br /> 69),North Depot <br /> Soils Arca <br /> (DSER7S 67) <br /> 24. R6 DSER7S 072 R6 No Further Response Anion RIO R6 31-Aug-00 R6 60 days R6 30-Od-00 R6 I5-Feb-0l R6 30days R6 16-Mr-0I R6 WMr-0I Cvs dei'ulieuofmraels"Sardcbnae <br /> Planned Secondary R7 R7 R7 R7 R7 wood:v„n.worporreM wferaae nm ROD <br /> RIO RIO RIO ser .d.1 arM the fxwl Tracy Cl..Report, <br /> 25. Be DSE0.TS R, Be Amendment to the Reward of Primary R9 I4-Mry-0I 60 days R9 I140I41I H9 27-Aug-01 RII 60 deya' R9 261M-0I R9 264hT-0I �b.mkninn of UxERR];cMgen <br /> OU-I OWTP surface Decision(ROD) R12 R12 RI2 R1 Fill atsTP desbarge opiwn.ard Sss•MV 4ehk <br /> discharge,SWMU 4msragernesd decuion kuo the Rl]O fa DOK- <br /> R12 R12 Tract. Find sabmmion dare ucludestone fa <br /> puble foment pwiod. <br /> 'Alternatively filled"Preliminary and Find Rrrodiel Deigns•in the original FFA Delivery Schedule. ROD-Record of Decision SWMU-Solid Ware Managaient Unit <br /> v Alternatively titled'Project Closonal Pian"ill the original FFA Delivery Schedule. FFA-Federal Facilities Agreement RA-Remedial Action <br /> 'Increased review period to account this required public review and wrrerern periods S VE-Soil Vapor Extraction TBD-To Be Ddamined <br /> "labeled"Fine!" QA/QC-Quality Amurance/Qudity,Control N/A-Nor Applicable <br /> a Labeled"Revised Fine!" OU-Operable Unit EEICA-Engineering EvdurioNCad Analysis <br /> ESD-Explanation O'Signifirnl Dineranees <br /> R-These dates were revised and the review time periods adjusted per participant agreement during the 15 April 99 RPM Meeting (file name: 7CYFFA4a.x1s) <br /> R2-These dare wire revised and the review it.period,adjusted per participant agreement bored on discussions held during the 21 July 99 RPM I ing.(file hare: 7CYFFA3dr) <br /> RJ-These dales were revised per participant egrearent and action during the 21 October 1999 RPM meting (fle name: TCYFFA6n.rls) <br /> Be-Thee date were revised in reponse to the EPA Inver dared 30 Novmtw 1999. (file name.' TC,YFFA7a.xls) <br /> RS-Thee dare wee revised pa mind DTSC/RWQCB cannenls received on 4 Jan 00,and written EPA consulate received on 6 Jan OD. (file name: 7CY1FA8bds) <br /> R6-Thea(tare were revised bored can CEHNC and DDJC Input with the assumption then all funding Issue for the program will be resolved by 31 August 2000 (file rum 7CYFFA9bx1,) <br /> R7-Thee Ilene were revised based on CEHNC and DD1C Input,during the RPM neeing of 12 July 2000. Qife name. 7CYFFAIOA.x/t) <br /> Rg-These item sense revised based on regulatory agencywrillm wnnnrtana(SWMU 4)and CEHNC and DDJC rope on 17 odoba 00 . (file mme: 7CYFFAIIsIs) <br /> R9-These Itme were revised bead m RPM input dosing the DD1C-Tracy RPM meeting m 23 October 2000. Mlle mens: 7CYFFA12als) <br /> RIO-They ilars wee revised based on DDJC-FA later requesting eacadons,dared 29 November 2000. (file mmr. 7CYFFA12ada) <br /> RI I-These itane were revised based on DDJC-FA lea requesting extensions,dared XX January 2001. (flfe mme: 7CYFFAI26ds) <br /> RIZ-Thee Ilene was revised bred on RPM input during the DDJC-Tracy,RPM neeeing on 24 January 2001. (file marc: 7CYFFAIJdi) <br /> NOTE: Fa secondary documents,the RPMs,gra that responses to draft documeNt review comments will be prepared and lorwaded to reviewers a 8r In advance ofthe find submission a practicable. • <br /> ••Ifwnnents ere received on a daft find docuteel,a revised draft final subrnitd will be provided within 43 calendar days after receipi ofa11 rot 13 <br /> 'dant find documents wnl be submllled with a liner cover end"No page. OV INn <br /> "I no commar6s am rxelvad by the end of Over draft final review period,me docvmnerd win to emnsidand feel. Tcyalr ore <br />
The URL can be used to link to this page
Your browser does not support the video tag.