My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 0 <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> FACILITY: Defense Distribution Region West, Tracy OCT 2 <br /> 1994 <br /> LOCATION: Tracy, CA ENVIRONMENTAL HEALTH <br /> CONSULTANT: Montgomery Watson PERMIT/SERVICES <br /> PROPOSAL DATE: 11 October 1994 Letter from Ms. Conny Mitterhofer <br /> (Montgomery Watson) to Ms. Karen Bessette (Regional Water <br /> Quality Control Board).requesting an approval form regarding <br /> permit application sent to Ms. Margaret Lagorio (San Joaquin <br /> County Public Health Services, Environmental Health Division) <br /> for field activities necessary in implementing the Draft <br /> Comprehensive Remedial Investigation/Feasibility Study - Phase <br /> II Work Plan. The California Regional Water Quality Control <br /> Board provided comments on this Work Plan 12 August 1994. <br /> [ ] Monitoring Well(s) <br /> [x] 80 Soil Boring(s) <br /> [x] 55 Soil Boring(s) Soil Gas <br /> [x] 8 Soil Boring(s) Hydropunch <br /> We have reviewed the above proposal concerning the above check items and the proposal is <br /> acceptable. <br /> Date: 11 October 1994 Staff Signature: <br /> KAREN BESSETTE <br /> Project Engineer <br /> Comments: <br /> 1. The number of soil borings for soil samples, soil gas samples, or ground water <br /> samples using hydropunch methods may vary depending on result obtained <br /> during field activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.