DDRW TRACY FFA SCHEDULE <br /> (Revision to 22 October 1993 Version) <br /> Operable Unit #1 Remedial Design Schedule Deadline <br /> Draft Preliminary Design Data Report (PDDR) 5 Oct 94 <br /> (Secondary) ( 30-day review) <br /> Draft Remedial Design (RD) and Draft Remedial 4 Dec 94 ( 1 ) <br /> Action Work Plan (RAWP) (Primary) <br /> Continuous Onsite Remedial Activity 12 Nov 94 (2 ) <br /> Draft Final Remedial Design. and Draft Final 23 A.pr 95 ( 3 ) <br /> Remedial Action Work Plan (Primary) <br /> 95% Construction Specs and Drawings 18 Aug 95 <br /> (Secondary ) ( 21-day review) <br /> Full-scale Onsite Remedial Activity 4 Dec 96 <br /> ( 1 ) This design document will include the following work plans <br /> for review in order to keep key contracting documents together <br /> while minimizing the number of documents for submission and <br /> review: <br /> Site-Specific Health/Safety Plan, Field Sampling Plan, <br /> Construction Quality Assurance Plan, Operation and Maintenance <br /> Plan, Groundwater Monitoring Plan (as well as identify the <br /> locations of the extraction, injection and performance systems <br /> and their associated pumping rates ) . <br /> ( 2 ) The Interim Remedial Measure ( IRM) is anticipated to <br /> operate at 35 percent of the OU-1 design capacity by 12 Nov 94 . <br /> The Defense Logistics Agency believes that this satisfies CERCLA <br /> section 120 (e) ( 2 ) . <br /> ( 3 ) The Final Design and Remedial Action Work Plans represent <br /> 100 percent design when final (less the construction <br /> specifications and drawings ) . These deliverables will meet the <br /> primary document requirements required in the Federal Facilities <br /> Agreement. Additional time is required following the draft <br /> final documents to further develop the technical specification <br /> and cost requirements for contracting. action. <br /> Approved May 19, 1994 <br />