Laserfiche WebLink
3.2 PREPARATION <br /> 3.2.1 Decontamination <br /> The drill rig, drill rods, drill bits, augers, temporary casing, well developing equipment, tremie <br /> pipes, grout pumping lines, and other associated equipment shall be cleaned with high-pressure <br /> hot water/steam prior to drilling at each monitoring well location, and before demobilization. <br /> Decontamination shall be done in accordance with ASTM D-5088. Equipment, tools, and <br /> supplies shall be placed on racks, saw-horses, or plastic sheeting to avoid contact with the <br /> ground. Decontamination shall be performed in accordance to paragraph 3.2.2 at a central <br /> decontamination station. The decontamination station will be designated by Tracy DD IEC. <br /> Screen and well casing shall be cleaned with high-pressure hot water immediately prior to <br /> installation in the well. The use of factory sealed(plastic wrapped) screen and well casing does <br /> not waive this requirement for pre-installation cleaning. Samplers, for soil sampling, can be <br /> alternatively cleaned by washing with a non-phosphate detergent, a tap water rinse, and a DI <br /> water rinse. Tracy DD has a non-chlorinated water source which will be used for all <br /> decontamination procedures during this project (see paragraph 3.2.3). <br /> 3.2.2 Decontamination Station <br /> The Contractor shall construct a temporary decontamination pad onsite. The pad shall be bermed <br /> and slightly inclined towards a sump located in one of the back comers of the pad. Plastic <br /> sheeting shall line the pads and berms to contain decontamination water. Plywood sheeting, <br /> exterior grade, shall be placed over the plastic sheeting to prevent damage to the plastic and allow <br /> the drill rig and heavy equipment to use the pad. The minimum dimensions of the pad shall be the <br /> length and width of the drill rig,plus 4 feet per side to allow access and steam cleaning. Yellow <br /> ribbon shall be used to encircle the decontamination pad. Water collected in the sump shall be <br /> pumped using a "trash" pump to transfer water to a 55 gallon drum labeled 'Decontamination Pad <br /> Sump Water." Solid waste shall be transferred to a separate 55 gallon drum labeled <br /> "Decontamination Pad Sump Sludge." <br /> 3.2.3 Water Source <br /> Water for decontamination and water for well drilling/installation, if required, shall be from a <br /> designated source on base. Non-chlorinated water,provided by the base, shall be used for all <br /> decontamination and drilling procedures. The Contractor shall provide a clean container for <br /> storage of the water until it is to be used. The Contractor shall be responsible for obtaining the <br /> water from the source, transporting it to and storing it at the site. <br /> 3.3 INSTALLATION <br /> Two (2) new monitoring wells will be drilled and installed under this contract, one shallow and <br /> one deep. Locations of the new monitoring wells will be coordinated with the IEC. Specific <br /> 02671-005 <br />