My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/06/00 WED 17_58 FAX 916 3820802 DAMES & MOORE SAC • 2008 <br /> DDJC-Tracy OU 1 Groundwater Treatment for Pesticides,Pump Test Work Plan <br /> 1.0 INTRODUCTION abandonment of the wells at the completion of <br /> the aquifer test. <br /> 1.1 The purpose of this document is to describe <br /> the specific field activities to be performed in 2.1 Temporary Piezometer <br /> support of remediation efforts at Defense Installation <br /> Distribution Depot San Joaquin,Califomia <br /> (DDJC)-Tracy, California. The work to be 2.1.1 Thirteen temporary observation <br /> performed under this effort will include piezometer wells(OW-WTO1 through <br /> temporary observation piezometer installation OW-WT13,see Figures 3 and 4)will be <br /> and aquifer testing at existing monitoring and installed and developed according to the general <br /> extraction wells, procedures described in the Comprehensive <br /> Field Work Plan as modified by this work plan. <br /> 1.2 This project-specific work plan is an All temporary observation piezometer wells will <br /> addendum to the Comprehensive Field Work be completed in the Above Upper Horizon zone <br /> Plan(Radian International,2000)for all field ranging from approximately 20 to 30 feet below <br /> activities at DDJC-Sharp and DDJC-Tracy. ground surface(bgs). <br /> General procedures, specifications,and <br /> requirements for the work described in this 2.1.2 The observation piezometers will be <br /> project-specific work plan are presented in the placed at distances of 10,25,50, 100, 150 and <br /> Comprehensive Field Work Plan and will be 200 feet from the tested well for LM 174AU and <br /> performed as set forth in that plan. as shown for EW 040AU. They will he aligned <br /> parallel to the east-west access road to the <br /> 2.0 FIELD WORK SUMMARY immediate north of EW 040AU and LM 174AU. <br /> This alignment was selected to evaluate the <br /> 2.0.1 The work to be performed during this field potential capture zones for each well at the test- <br /> effort at DDJC-Tracy is scheduled to begin in pumping rate. Final placement and distances <br /> November 2000 and includes the following: will be determined by field conditions. <br /> • Installation of 13 temporary observation 2.1.3 Borings for the observation piezometers <br /> piezometers; will be created using direct push techniques <br /> similar to those used for cone penetrometer <br /> • Aquifer testing of existing wells EW 040AU testing(CPT). This involves pushing a 2-to <br /> and LM 174AU(future EW 045AU); 3-inch diameter casing with a drive tip into the <br /> ground to the desired depth. This depth will <br /> • Surveying locations of the temporary initially be estimated based upon the current <br /> observation piezometers;and water level in existing nearby wells and the <br /> distance firm the extraction well. When the <br /> • Abandonment of the temporary observation boring has reached the desired depth,the casing <br /> piezometer wells. will be pulled partially back to permit <br /> groundwater to enter. Once the water level <br /> 2.0.2 The location of this work is shown in within the casing has stabilized,the depth to <br /> Figure 1.The proposed temporary observation water will be measured and the final screen <br /> piezometer locations are depicted on Figures 2 requirements for the observation piezometer will <br /> through 4. This phase of field work will begin be determined, <br /> with the installation of the temporary <br /> observation piezometer wells. Once installed, 2.1.4 The blank casing for the observation <br /> these observation piezometers will be given an piezometers will be 1 %cinch diameter flush- <br /> "OW'prefix prefix designation with a number and thread PVC pipe. The casing will be free of <br /> letter in accordance with the current designation solvents, oils,grease, paint and dirt and will be <br /> system at DDJC-Tracy' Observation piezometer certified clean from the factory or steam cleaned <br /> well locations will be surveyed prior to the on site prior to installation. The casing will not <br /> OU-1 Pump Tm VIP 1 November 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.