Laserfiche WebLink
12/06/00 WED 17:40 FAX 916 387 0802 DAMES & MOORE SAC Z013 <br /> DDJC-Tracy OU 1 Groundwater Treatment for Pesticides,Pump Test Work Plan <br /> be removed from any wrappings until barometric probe. The probe will collect air <br /> immediately before it is to be placed into the pressure data at the same measurement interval <br /> boring- as for the water levels. <br /> 2.1.5 The well screen for the observation 2.2.3 Stepped pumping rare tests will consist of <br /> piezometers will be I '/2-inch diameter PVC with at least four progressively higher pumping rates <br /> 0.010-inch slots. The well screen surface will be with a minimum duration during each step of 60 <br /> free of solvents, oils,grease,paint and dirt and minutes. Specific procedures for stepped <br /> will be certified clean from the factory or steam pumping tests are outlined in the Comprehensive <br /> cleaned prior to installation. Screen sections Field Work Plan. , <br /> will not be removed from any wrappings until <br /> immediately before being placed into the boring. 2.2.4 Monitoring well LW 174AU(future EW <br /> The screen length for the piezometer will depend 045AU)will first be evaluated for conversion <br /> upon how close it is to the test well. To into an extraction well. A stepped pumping rate <br /> accommodate projected drawdowns, observation test will be conducted to estimate the optimum <br /> piezometers 50 feet or closer to the pumping pumping rate and anticipated drawdown. If the <br /> well will have at least 10 feet of screening. results are favorable,a 24-hour constant rate <br /> Observation piezometers greater than 50 feet pumping test will be conducted to evaluate the <br /> will have 5 feet of screen. Final screen length long-term performance of the well and aquifer. <br /> determination will be made in the field based <br /> upon the observed conditions. For all 2.2.5 Well EW 040AU will be pumped at a <br /> completions,the top of the screen shall be no constant rate of approximately 9 gallons per <br /> higher than the top of the water table. minute(gpm)for at least 24 hours. This <br /> pumping rate is based upon previous pumping <br /> 2.1.6 Each piezometer will be tests conducted on the well in 1999(Radian <br /> developed after installation. Development International, 1999). No stepped pumping test is <br /> procedures will generally follow those outlined planned because this test was conducted in 1999. <br /> in the Comprehensive Field Work Plan. To <br /> develop a natural filter pack,piezometers will be 2.2.6 Drawdown and recovery data from both <br /> bailed using a sand bailer or similar device to pumping tests will be evaluated using <br /> remove sand and fine sediment from the bottom AQTESOLVTm to estimate aquifer parameters. <br /> of the piezometer. in addition to analysis methods and procedures <br /> outlined in the Comprehensive Field Work Plan, <br /> 2.2 Aguifer Testing the drawdown data should be evaluated with the <br /> Neuman(1975) analysis for wells with delayed <br /> 2.2.7. The set-up and conduct of the aquifer yield. The Neuman method is not described in <br /> testing will follow the procedures outlined in the the Comprehensive Field Work Plan but should <br /> Comprehensive Field Work Plan and as be considered for this test because delayed yield <br /> modified here. Pressure transducers will be may occur near the pumping well. <br /> placed in each of the observation piezometers <br /> during the test. Additional transducers will be 2.3 Location Surveying <br /> installed in existing, nearby wells to supplement <br /> the water level measurements collected in the Location and elevation surveying is <br /> observation piezometers and to provide recommended for the 13 temporary piezometers, <br /> background measurements. Water levels in all according to the procedures outlined in the <br /> instrumented wells will be backed up with Comprehensive Field Work Plan. <br /> manual measurements. <br /> 2.2.2 Barometric pressure changes and potential <br /> influence on groundwater levels will be <br /> evaluated by recording the air pressure using a <br /> OU-1 Pump Test WP 6 Nwemba 2000 <br />