My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/06/00 WED 17:41 FAX 916 3116802 DAMES & MOORE SAC • Z015 <br /> DDJC-Tracy OU 1 Groundwater Treatment for Pesticides,Pump Test Work Platt <br /> Table 3-1 Baseline Budget <br /> (Pump tests will be run at the same time.) <br /> Expense Qty/ Piezometer Qtyl Step Test Qty/ Pump Test Qty/ Pump Test <br /> Category Rates Hours Installation Hours LM174AU Hours LM174AU Hours EW040AU <br /> Labor <br /> Geo 1 $55 36 51,980 16 $880 20 $1,100 20 $1,100 <br /> Technician $45 $0 $0 9 $405 9 $405 <br /> Per Diem $85 3 $255 $0 2 $170 2 $170 <br /> Vebicle Usaee $30 3 $90 1 $30 2 $60 2 $60 <br /> F:auiomcnt <br /> Generator $300 1 $300 <br /> Gtundfos pump $700 l $700 <br /> Big GtundfosPump $1,000 1 $1,000 <br /> Hermit Dam Logger $1,000 1 $1,000 1 $1,000 <br /> Baker Tanks $500 1 $500 1 $500 <br /> Vac Truck $65 20 $1,300 <br /> other Nfisc-ODCs $200 1 $200 1 $200 1 $200 1 $200 <br /> Subcontracts <br /> Utility Clearance $2,300 1 $2,300 <br /> Gregg Drilling $7,200 1 $7,200 <br /> Sampling $800 1 $800 <br /> Well Abandonment $1,800 1 $1,800 <br /> Surveying $1,200 1 $1,200 <br /> $15,825 $1,110 $4,135 $6,03 <br /> TOTAL $ 27,105 <br /> Assunrprioes <br /> Drilling cost is$17per foot x 390 feet,assuming each well goes to 30 feet Development included;$500 mob charge <br /> Well abandonment is$3 per foot x 390 feet plus mob charge$500. <br /> Piezometer installation is estimated for 3 days of"rk,and includes stable water levels in rods before installation <br /> Work may only be two days,three used for estimate <br /> Surveying is for 1 day of work <br /> Pump Charges arc per week,for set-up and breakdown time,also step-test time for LM 174AU. <br /> Step Test will be done day before pump test,therefore pump and Baker Tank charges go to pump test for LM 174AU. <br /> Pump test assumes that daring night-time second shift,there will be an additional technician on site,so there will be two people over a 12 <br /> period at night Pump test also assumes both tests will be run simultaneously. One Baker Tank per site. Rental Charge is per month <br /> Two Geos will be needed for pump test one for 1 st 12 hour shift,another for the next,which is why per diem is 2 days per site. <br /> Nate:Baker tanks may not be necessary,if water can be trained into drainage hole by EW 27B and EW 22A. Checking with Turn Tech. <br /> Vacuum truck may be necessary to transfer water if we cant use hole to drain water. <br /> Radian has one generator at Sharpe- This one can be used,but will have to rent an additional one. Assume weekly rental charge. <br /> Hours include about 3-4 hours of preparation and travel. <br /> OU-1 Pump Test WP 8 November 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.