My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDfTracy OU 1 Pesticide Remediation <br /> Groundwater Piezometer Abandonment and Installation Work Plan <br /> TABLE OF CONTENTS <br /> Pane <br /> 1.0 INTRODUCTION AND BACKGROUND.....................................................................................1 <br /> 2.0 TEMPORARY PIEZOMETER ABANDONMENT.......................................................................1 <br /> 3.0 PIEZOMETER INSTALLATION ACTIVITIES............................................................................2 <br /> 4.0 PIEZOMETER MATERIALS.........................................................................................................2 <br /> 4.1 Piezometer Casing...............................................................................................................2 <br /> 4.2 Piezometer Screen...............................................................................................................2 <br /> 4.3 Filter Pack............................................................................................................................5 <br /> 4.4 Bentonite Seal......................................................................................................................5 <br /> 4.5 Cement Grout......................................................................................................................5 <br /> 4.6 Wellheads.......................................:....................................................................................5 <br /> 5.0 POST-PIEZOMETER-INSTALLATION ACTIVITIES................................................................5 <br /> 5.1 Investigation-Derived Waste...............................................................................................5 <br /> 5.2 Piezometer Location Surveying...........................................................................................5 <br /> 5.3 Groundwater Water Level Measurements...........................................................................5 <br /> 5.4 Data Management................................................................................................................6 <br /> 6.0 REFERENCES ................................................................................................................................6 <br /> LIST OF FIGURES <br /> Paae <br /> 1-1 OU 1 Pesticide Treatment Groundwater Extraction Wells,DDJC-Tracy.......................................3 <br /> KAWpracess\00701\Trecy\0U1 Pst PZ Abnd\DRAFI\text.dm i June 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.