My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:33:59 AM
Creation date
5/29/2019 11:23:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DDJC-'Tdcy Well Installation Work Plan <br /> TABLE OF CONTENTS <br /> Paqe <br /> 1.0 INTRODUCTION........................................................................................................................... 1 <br /> 2.0 FIELD WORK SUMMARY........................................................................................................... 1 <br /> 2.1 Well Installation Activities................................................................................................. 1 <br /> 2.2 Drilling Methods ................................................................................................................ 3 <br /> 2.3 Monitoring Well Construction............................................................................................3 <br /> 2.4 Well Development.............................................................................................................. 3 <br /> 2.5 Location Surveying............................................................................................................. 3 <br /> 2.6 Investigation Derived Wastes............................................................................................. 3 <br /> 2.7 Groundwater Sampling and Analysis................................................................................. 3 <br /> 2.8 Well Abandonment.............................................................................................................4 <br /> 2.9 Data Management...............................................................................................................4 <br /> 3.0 REFERENCES ...............................................................................................................................4 <br /> ATTACHMENTS <br /> Attachment 1 Monitoring Well Schematic Drawing <br /> Attachment 2 Well Construction Logs for IW001, IW002, and IW003 <br /> LIST OF FIGURES <br /> Paqe <br /> 2-1 Location of Proposed Monitoring Well and Injection Wells to be Abandoned -DDJC-Tracy....... 2 <br /> RFWI-TOC.DOC i December 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.