Laserfiche WebLink
• DDJOacy Well Installation Work Plan <br /> 2.2 Drilling Methods 2.3.2 Filter pack material,bentonite seal <br /> support sand,bentonite seal, and annular space <br /> 2.2.1 The proposed monitoring well will be grout seal will be placed in accordance with <br /> drilled and installed into the Above Upper guidelines set forth in the Comprehensive Field <br /> Horizon, which is estimated to be from 25 to 50 Work Plan. <br /> feet below ground surface in the northern <br /> portion of the DDJC-Tracy facility. 2.3.3 Precise well screen placement will be <br /> determined based on observed lithology from <br /> 2.2.2 Hollow Stem Auger. One 8-to 9-inch soil cores and depth at which groundwater is <br /> diameter boring for the monitoring well will encountered. The well will be screened in the <br /> initially be drilled with 4-1/4-inch internal Above Upper Horizon aquifer, which is <br /> diameter hollow stem augers to obtain a estimated to be at a depth of approximately 20 <br /> continuous core for lithologic logging. Drilling to 30 feet below ground surface. All well <br /> and sampling will occur according to the construction details will be documented <br /> procedures outlined in the Comprehensive Field accordingly. <br /> Work Plan. Prior to monitoring well <br /> construction, the boring will be reamed with 2.4 Well Development <br /> larger diameter augers to provide sufficient <br /> annular space for construction. The monitoring well will be developed after <br /> well casing installation.Well development <br /> 2.2.3 Lithologic logging of the soils obtained procedures will follow those outlined in the <br /> from the borehole will be documented in Comprehensive Field Work Plan. <br /> accordance with the procedures outlined in the <br /> Comprehensive Field Work Plan. 2.5 Location Surveying <br /> 2.3 Monitoring Well Construction Coordinates and elevation surveying of the <br /> newly installed monitoring well will be <br /> 2.3.1 Monitoring well construction procedures performed in accordance with the <br /> will be performed in accordance with those Comprehensive Field Work Plan. <br /> outlined in the Comprehensive Field Work Plan. <br /> The proposed monitoring well location is shown <br /> in Figure 2-1. A schematic diagram of a typical 2.6 Investigation Derived Wastes <br /> monitoring well design is included as <br /> Attachment 1 to this work plan. Monitoring well Investigation derived wastes (IDW), consisting <br /> construction details for proposed well of soil cuttings and groundwater purged during <br /> LM174AU are presented below. well development, will be managed in <br /> accordance with procedures described in the <br /> • Well casing will be 6-inch nominal diameter DDRW-Sharpe/Fracy Waste Management Plan <br /> Schedule 40 blank PVC casing from 0 to 20 (August 1996). <br /> feet(6-inch diameter casing and screen will <br /> be installed for possible future conversion to 2.7 Groundwater Sampling and <br /> a groundwater extraction well, if needed). AnalVsis <br /> • The well screen will be 6-inch nominal Groundwater samples will be collected <br /> diameter stainless steel slot screen, 0.020 following installation of LM174AU as part of <br /> inch slot size from approximately 20 feet to the Well Monitoring Program. Samples will be <br /> 40 feet bgs. analyzed for volatile organic compounds and <br /> • The wellhead will be constructed with a pesticides by U.S. EPA Methods SW8260 and <br /> flush-mounted, traffic rated, utility box. SW8081, respectively. Groundwater sampling <br /> and analysis activities will be performed using <br /> RFWI.DOC 3 December 1999 <br />