Laserfiche WebLink
x:2098581023 Sep 26 2015:44 P. 02 <br /> City of <br /> Department of Public Works 390 Tovme Centre Drive,Lathrop,C.A.95330 <br /> We are building a City! Phone(209) 941-7430—fax(209) 941-7449 <br /> ww�v.d.lathrop_ca.us <br /> September 26,2005 <br /> Mike lnfutna <br /> San 7oaquin County Environmental Health Department <br /> 304 East Webber Avenue, Third Floor <br /> Stockton,California 95202 <br /> RE: Monitoring Wells for City of Lathrop—Mossdale Subarea and Wastewater <br /> Treatment Plaint Facility <br /> Dear Mr. Infurna: <br /> As requested during your discussions with Zachary Crawford of ENGEO,the City of <br /> Lathrop is submitting this letter regarding well MBRMW-4,located in MBR Wastewater <br /> Treatment plant(see attached Figure 6c), and wells RMW-4 and RMW-5, located near <br /> Pond D(see attached figure 6d). These wells, currently scheduled for construction on 27 . <br /> September 2005,were outlined in the report prepared by Hydrofocus, lnc. entitled <br /> Revised Monitoring Well Installation Workplan and Groundwater Sampling and Analysis <br /> Plan("Workplan"), dated 18 April 2005. This report was prepared.on behalf of the City <br /> of Lathrop pursuant to the Regional Water Quality Control Board Waste Discharge <br /> Requirements Order No.R5-2005-0045. <br /> The City of Lathrop has agreed to take ownership of these three wells. Maintenance and <br /> coordination of the eventual abandonment of these wells will be the complete <br /> responsibility of the City of Lathrop. <br /> Should you have any questions or concerns please contact Greg Gibson,the staff <br /> engineer directly involved with this project at(209)941-7442. <br /> Sinc y, <br /> Cary beIoPublic <br /> Director Works <br /> Copy: Greg Gibson,Associate Engineer <br /> I:\PobliCWorks\Enginee6ng\GIP\WaStewater\LettBr to EWD 9.26.05.dOC <br />