Laserfiche WebLink
• i <br /> Reiter Well Inventory. <br /> Previous ID Driller/Consultant Year New ID Status Plans <br /> Drilled <br /> RMW-1 Spec Ex loration 2004 RMW-1 E Monitoring well. <br /> RMW-2 Spectrum Ec loration2004 RMW-2 E Monitoringwell. <br /> RMW-3 Spectrum Exploration 2004 RMW-3 E Monitoring well. <br /> — — RMW-4 N Proposed monitoring <br /> well. <br /> — RMW-5 N Proposed monitoring <br /> well. <br /> E= Existing. <br /> PD = Presumed destroyed. <br /> N = New. <br /> MBR Facility Well Inventory. <br /> Previous ID Driller/Consultant Year New ID Status Plans <br /> Drilled <br /> Proposed <br /> MBRM-1 N <br /> monitoring well. <br /> — — — MBRM-2 N Proposed <br /> monitoring well. <br /> N Proposed <br /> MBRM-3 <br /> monitoring well. <br /> MBRM-4 N Proposed <br /> monitoring well. <br /> E= Existing. <br /> PD = Presumed destroyed. <br /> N =New. <br /> 3) Review and justify/revise Phase 1 and Phase 11 land application area <br /> monitoring wells. <br /> Mossdale <br /> We revised Figure 6a in the April 18, 2005 workplan to include the March 2004 <br /> groundwater elevation contours that were plotted in Figure 3. We then utilized <br /> the revised Figure 6a to justify/revise Mossdale (Phase 1) monitoring well <br /> locations and monitoring objectives. The well locations are shown on the <br /> attached Figure 6a (revised), and the monitoring objectives are summarized in <br /> Table 2 (revised) below. <br /> - 5 - <br />