My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:47:55 AM
Creation date
5/30/2019 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Louise Avil EXPLANATION <br /> Monitoring Well <br /> Existing Water Recycling Plant <br /> (WRP-1)monitoring well <br /> Existing WRP-1 monitoring well <br /> • utilized to monitor basin E and <br /> pond 3MBR <br /> �•` New 0 1,000 2,000 <br /> Existing Storage Pond Feet <br /> 0 Planned Storage Pond <br /> Groundwater Elevation Contour, 2003 average, in ft. <br /> K Ivl IN-5 <br /> a OArcYPkyy <br /> C:) o 0 0 0\ O KNMI-6 a. <br /> 2 S a K <br /> Q Vc <br /> KMW-2 .ro <br /> MW- 0 KMW-4 <br /> /Vest/e way W BRMW-4 <br /> KMW-1 0 <br /> _y <br /> B <br /> MBRMW-3 <br /> G�.`S(oPN 5 MBRMW-2 <br /> I I Pond 3MBR <br /> W-I ?o MBR Wastewater <br /> Treatment Plant <br /> 120 <br /> Note: Locations of new monitoring wells are approximate. <br /> Final locations will be selected using site improvement <br /> plans and actual onsite conditons. <br /> HYDROF�CUS= Proposed monitoring well network, MBR Wastewater Figure 6c <br /> Treatment Plant, Lathrop, California revised <br /> UUWQ PROJECT:5023 DATE:4/25/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.