Laserfiche WebLink
EXPLANATION <br /> Monitoring Well with 3rd Quarter 2009 <br /> Groundwater Elevation (NAVD 88) <br /> 4.00• Crossroads WWTF Network <br /> 5.28 <br /> WRP-1 Network <br /> Groundwater Elevation <br /> Contour, in ft. (NAVD 88) <br /> Approximate Groundwater <br /> Flow Direction 0 750 1,500 <br /> 0 Land Application Site Feet <br /> 0 Storage Pond <br /> Dgrc <br /> CP <br /> Y PkWy O LAS-3 9.07 a <br /> d7 <br /> -c 4.00 O <br /> E <br /> .75 • <br /> 4.53 <br /> Neste W • 58 6.08 <br /> a <br /> LAS 7.0 <br /> 4.45 • and <br /> S5 <br /> 4.90 5.58 <br /> WRP-1 MBR Water <br /> Pon ° Pond Recycling Plant <br /> day 40 A S 5.28 <br /> n <br /> t �� C <br /> GrrS�opre Pond 6'0 <br /> 6.82 • 7.29'•o <br /> Crossroads Wastewater <br /> Treatment Facility <br /> 120 <br /> Water levels in Crossroads WWTF network wells were measured <br /> by FGL Environmental on 7/27/09. Water levels in WRP-1 <br /> network wells were measured by HydroFocus on 7/27/09. <br /> H0 Groundwater Elevation Contours, 3rd Quarter 2009, Figure <br /> YDRCrossroads Wastewater Treatment Facility. 3 <br /> PROJECT: 5040 DATE: 9/11/09 <br />