My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
230
>
2900 - Site Mitigation Program
>
PR0506532
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:04:55 PM
Creation date
5/30/2019 4:00:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506532
PE
2960
FACILITY_ID
FA0007479
FACILITY_NAME
VACANT PROPERTY - FORMER CAIN ELECTRICAL
STREET_NUMBER
230
Direction
N
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04302301
CURRENT_STATUS
01
SITE_LOCATION
230 N CHURCH ST
P_LOCATION
02
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 Eomu.o r".+.ESS.-OWN Jn, <br /> dbukRNtSd <br /> R :$9 <br /> "+.. MATINEW RooslWEI <br /> .. e9l JiItoNAiEHTAI PNiYTECTipN <br /> Water Boards <br /> ..............................................................................................................................................................................................._........................... <br /> Central Valley Regional Water Quality Control Board <br /> October 7, 2014 <br /> Mr. Jim Weber <br /> Estate of Mr. Herman Harry Weber <br /> 2229 Manzanita Court <br /> Lodi, CA 95242 <br /> REVIEW OF SOIL VAPOR EXTRACTION REMEDIATION WORK PLAN, CAIN ELECTRICAL <br /> WORKS, 230 NORTH CHURCH STREET LODI, SAN JOAQUIN COUNTY <br /> Staff of the California Regional Water Quality Control Board, Central Valley Region (Central <br /> Valley Water Board) reviewed the July 18, 2014 Soil Vapor Extraction Remediation Work Plan, <br /> for the Cain Electrical Works site located at 230 North Church Street in Lodi prepared and <br /> submitted by Advanced GeoEnviron mental, Inc. (AGE). AGE proposes conducting soil vapor <br /> extraction (SVE) to cleanup tetrachloroethene (PCE) pollution previously identified in soil vapor <br /> at the site. <br /> The former Cain Electrical Works occupied 230 North Church Street in Lodi between about <br /> 1950 and the early 2000's and used PCE for cleaning metals in its business operations for at <br /> least a portion of its occupancy. Elevated levels of PCE have been found in soil vapor beneath <br /> the former facility which is now an empty lot. Groundwater is about 50 feet below ground <br /> surface. Soil vapor samples have contained up to 10,600 micrograms per cubic meter of PCE. <br /> Groundwater samples have not contained any detectable volatile organic compounds. <br /> AGE proposes installing four SVE wells in the northern portion of the site where the highest soil <br /> vapor concentrations have been detected. Each SVE well will be constructed with screen <br /> intervals extending from 15 to 45 feet below ground surface. The sand filter pack will extend to <br /> approximately 2 feet above the screen interval. A one-foot bentonite seal and cement grout will <br /> fill the upper annular space. In addition to the four SVE wells, the SVE system will include a <br /> condensation removal tank, up to four 200-pound carbon vessels, and an SVE unit capable of <br /> extracting vapor at a rate of between 100 and 150 standard cubic feet per minute. Following <br /> startup, vapor samples will be collected using tedlar bags every two hours for four samples <br /> during the first day, daily during the first week, and weekly thereafter for analysis of VOCs by <br /> EPA Method 8260. <br /> The proposed implementation schedule includes SVE well installations within 30 days of the <br /> date of this letter and soil vapor extraction within 15 days following the well installations. An <br /> initial report may be prepared within 60 days if modification of the work plan is required based <br /> on early results. A final report will be submitted within 60 days after all monitoring data has <br /> been received and checked. <br /> KARL E. LomoLEY SCD, P..E.,GHAIR I PAMELA C.CREEoON P.E.,SCEE,EXECVTMF PFROER <br /> 11020 Sun Center Drive 0200,Ranaho Cordova,CA 95670 ( www.waterboarAe.Ca.90vlaentralvalley <br /> 0 nrov"40 PAPER <br />
The URL can be used to link to this page
Your browser does not support the video tag.