Laserfiche WebLink
Case 2:06-cv-02623-GEB-DAD Document 365 r=iled 04!20112 Page 2 of 6 <br /> I <br /> 1 2. Dopaco shall be responsible for the toluene located in the Dopaco Area, and <br /> 2 toluene which is, or has migrated from the Dopaco area;in lc uding remediation of the toluene and <br /> 3 any chemicals commingled with the toluene)and any monitoring that is required by the Central <br /> 4 Valley Regional Water Quality Control Board (hereafter"Water Board"). <br /> 5 3• Within the Dopaco Area, Dopaco shall excavate the source areas of the toluene, <br /> 6 and perform any other necessary remedial action sufficient to achieve the clean-up standards of <br /> 7 the Water Bo a � toluene +>^o i <br /> ��er i+varu <br /> for wit,Iene in gut, SviiBri <br /> dgoundwater On Or emanating from. s+ <br /> he DvpaC^v Area. <br /> 8 4. Newark shall provide Dopaco with reasonable access up <br /> on,reasonable prior notice <br /> 9 to perform the investigative and remedial work necessary to accomplish the purposes of the <br /> 10 Stipulated Injunction in this case. <br /> I 1 5. Dopaco shall contact the Water Board and enter into its voluntary clean-up <br /> 12 program, including payment of the Water Board's oversight costs. 1 <br /> 13 6. Dopaco shall comply with the following schedule of work, and provide written <br /> 14 notice to Newark at the completion of each of the following tasks, and shall copy Newark on all <br /> 15 of its relevant correspondence and documents sent to and from the Water Board. _ <br /> For the <br /> 16 purposes of this paragraph, all of the time periods specified below shall start from the date the <br /> 17 Court signs this Stipulated Injunction: <br /> 18 <br /> 19 a. Within 30 days,Dopaco shall prepare a work plan for the further investigation of <br /> the site and submit that plan to the Water Board for its approval. <br /> 20 b• Within 90 days, Dopaco shall meet with and obtain the Water Board's approval of <br /> 21 the investigative work plan it proposes. <br /> 22 C. Within nine months, Dopaco shall complete the investigation described in the <br /> 23investigative work plan and submit a proposed remedial work plan to the Water <br /> 24 Board for its approval. The remedial work plan shall include a proposal to <br /> 25 excavate toluene source areas as part of the remedial action per Paragraph 3 above. <br /> 26 d. Within 14 months, Dopaco shall meet with the Water Board and obtain its <br /> 27 approval of the remedial'Work plan. <br /> 28 <br /> STIPULATED[ern INJUNCTION 2 <br /> sf-3127787 ` ' <br />