Laserfiche WebLink
Anthony Smith - <br /> From: Barton,Jim@Waterboards.<jim.barton@waterboards.ca.gov> <br /> .Sent: Thursday, October 11,2012 10:17 AM <br /> To: Carolyn:Kneiblher <br /> Cc: Munch;James@Waterboards; Leon Marineau (leon_marineau@cascades.com); <br /> L'Orange, K Christian (Chris.L'Orange@dbr.com); Michael P.Pulliam <br /> (Michael.Pull am@dbr.com);Anthony Smith <br /> Subject: RE:Dopaco Area-800 West Church Street, Stockton, CA - Summary of 9 Oct 2012 <br /> Meeting <br /> Hi Carolyn, <br /> Thank you for your summary of our meeting. I discussed-the meeting with Jim Munch this morning and we have the <br /> following additions. <br /> 1) In lieu of installation of source.area well DM-5 and moving two of the four wells closer to the source area during the <br /> current sand zone investigation,we agreed that the source area definition, including vertical extent,will be addressed <br /> during a subsequent focused source area investigation. <br /> 2)We recommended the use of a mobile lab onsite during future fieldwork,to expedite the investigation process by <br /> .evaluating in the field,the placement and number of the borings/wells for optimal collection of data for use in future <br /> decisions/recommendations and updates to the site conceptual model. You indicated concurrence to consideration of a <br /> mobile lab,and we,requested that you check with San Joaquin County Environmental Health Department on the <br /> requirements of their boring permits if.the mobile lab data supports advancement/installation of additional <br /> borings/wel.Is during fieldwork. Their Geologist is Nuel Henderson, P.G.,who may be reached at(209)468-3436. <br /> 3)In addition to the schedule in the next report,we requested inclusion of milestones to reach case closure. Another <br /> consultant uses Microsoft Project 2010 for scheduling and milestones,and they provide file updates by email to me <br /> when necessary.. I can provide an example if you request it. <br /> Per these emails, I will post 7 January 2013 in GeoTracker as the due date for the sand zone investigation report. Please <br /> contact mein advance of that date if you need additional time to complete the report;as l may revise the due date upon <br /> request. <br /> Also, please submit the work plan for;the agreed focused,source area investigation on the same above due date for the <br /> report, in order to expedite the'investigation,process by my review of the two documents. <br /> Finally, please coordinate with me by phone or email on the schedulefo.r the upcoming field work,as I will make every <br /> effort to be present during the drilling of the four wells. <br /> Thanks again. <br /> Jim Barton <br /> James L.L. Barton P. G. <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive,#200 <br /> Rancho Cordova,CA 95670-6114 <br /> i <br />