Laserfiche WebLink
Mr. Jim Barton <br /> U IUS RWQCB <br /> July 26, 2012 <br /> Page 4 <br /> INVESTIGATION DERIVED WASTE <br /> Soil cuttings and wastewater generated during drilling and groundwater sampling <br /> activities will be placed in 55 gallon Department of Transportation approved steel drums, <br /> pending disposal. Following receipt of analytical results, waste drums will be transported <br /> to an approved facility for disposal. <br /> REPORTING <br /> A report will be prepared summarizing field activities, the results of soil and groundwater <br /> sampling, and our conclusions and recommendations. <br /> LIMITATIONS <br /> Background information, design bases, and other data have been furnished to.URS by <br /> The Newark Group and/or third parties, which URS has used in preparing this report. <br /> URS has relied on this information as furnished, and is neither responsible for nor has <br /> confirmed the accuracy of this information. <br /> If you have any questions or concerns, please do not hesitate to call us at (408) 297-9585. <br /> Sincerely, <br /> URS Corporation <br /> cFo<o <br /> O . SHALOM O . <br /> S. U� <br /> a MARQUARDTI� <br /> No.GEO 8901 ` /� :_1�},.� ! ___—�__. <br /> P C <br /> Shalom Marquardt, P.G. Vern Elarth, P.G. <br /> Project Geologist Project Manager <br /> Attachments: <br /> Figure 1 Site Location Map <br /> Figure 2 Proposed Sample Locations <br /> Appendix A URS Standard Operating Procedures <br /> cc: Mr. Bill Doerr, The Newark Group, Inc., 310 W. Water Street, Baltimore, OH <br /> 43105 <br /> Mr. Vern Elarth, URS Corporation, 100 W. San Fernando Street, San Jose, CA <br /> 95331 <br /> Ms. Shalom Marquardt;URS Corporation, 100 W. San Fernando Street, San Jose, <br /> CA 95331 <br /> I <br />