My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geospte& <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION................................................................................................ 1 <br /> 1.1 Background.................................................................................................. 1 <br /> 1.2 Site UST History .........................................................................................2 <br /> 1.3 Definition of the Dopaco Area....................................................................4 <br /> 2. SCOPE OF WORK............................................................................................... 5 <br /> 2.1 Task 1 —Engineering Survey....................................................................... 5 <br /> 2.2 Task 2—Initial Investigation....................................................................... 5 <br /> 2.2.1 Pre-Investigation Activities.............................................................6 <br /> 2.2.2 Cone Penetrometer Testing(CPT).......:.......................................... 6 <br /> 2.2.3 Membrane Interface Probe(.MIP)................................................... 7 <br /> 2.2.4 Groundwater Sampling................................................................... 8 <br /> 2.2.5 Quality Assurance/Quality Control................................................. 8 <br /> 2.2.6 Site Restoration and Investigation-Derived Waste (IDW)'.............9 <br /> 2.2.7 Preliminary Data Evaluation and Reporting.....................:.............9 <br /> 2.3 Task 3—Monitoring Well Installation and Development...........................9 <br /> 2.3.1 Well Location,Permitting, and Underground Utility Clearances. 10 <br /> 2.3.2 Drilling and Installation of Groundwater Monitoring Wells........ 10 <br /> 2.3.3 Surveying..........................................................................:........... 11 <br /> 2.3.4 Well Development...................................:.................................... 11 <br /> 2.3.5 Groundwater Sampling................................................................. 12 <br /> 2.3.6 Disposition of Waste Materials..................................................... 13 <br /> 2.4 Task 4—Reporting and Recommendations for Follow-up Work............. 13 <br /> 3. SCHEDULE ....................................................................................................... 14 <br /> 4. REFERENCES................................................................................................... 15 <br /> Final Work Plan.doc ii 27 June 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.