Laserfiche WebLink
Geosyntec® <br /> consultants <br /> • Groundwater samples will be collected using the low-flow pump and transferred <br /> into sample containers prepared by the analytical laboratory; and, <br /> • Sample containers.will be sealed, labeled, and then placed in a cooler with ice <br /> for transport to the laboratory. <br /> A blind duplicate sample will be collected from one well. One equipment blank will be <br /> collected during each day of groundwater sampling. Trip blanks consisting of organic- <br /> free, deionized water will be prepared by the laboratory and will accompany the sample <br /> containers during transport to, during, and after sampling. The trip blank sample bottles <br /> will not be opened. Groundwater and QA/QC samples will be handled under standard <br /> chain of custody procedures and will be analyzed for toluene by EPA Method 8260. <br /> .Purged water will be contained in drums, labeled, and remain at the facility, pending <br /> appropriate disposal. <br /> 2.3.6 Disposition of Waste Materials <br /> There will be some decontamination water generated during field work in addition to <br /> the purge water and soil cuttings. Before leaving the Site, Geosyntec will collect a <br /> composite sample of the purge water and decontamination water and a composite <br /> sample of the soil cuttings for waste classification. Following classification, the waste <br /> will be disposed of at an appropriate off.-site facility. <br /> 2.4 Task 4—Reporting and Recommendations for Follow-up Work <br /> Geosyntec will evaluate the data collected during Tasks 1, 2, and 3 and prepare a report <br /> documenting the work completed and summarizing the results for submittal to the <br /> RWQCB. The report will include CPT and MIP logs for each boring, well construction <br /> logs, analytical results, and summary tables and figures including one or more geologic <br /> cross-sections for the investigation area. Based on the results, conclusions and <br /> recommendations for future work will be made, as warranted. <br /> Final Work Plan.doc 13 27 June 2012 <br />