My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC.18.2000 5:34PM ARCADIS GERAGHTY&MILLER/JSA N0.698 P.6i17 <br /> i <br /> I � <br /> Site Specific Healtb & Safety Plant <br /> Site Information: Newark Sierra Paperboard <br /> Client Name- Stockton-Sierra Cogeneration <br /> Address; 800 West Church Street, Stockton, CA <br /> Client Contact: Paul Cummins <br /> I <br /> ARCADIS Geraghty& Miller Information: <br /> Project No.: RC000537.0001.00001. <br /> Project Manager: Mark Becker <br /> Prepared by: Mark Becker Date: 12/15/00 <br /> Reviewed by: <br /> Date: <br /> Objective of Site Visit: . <br /> j <br /> Install temporary soil borings. <br /> I <br /> A. Project Descriptlorf: <br /> X Activit Date <br /> y X Activity pati <br /> X Soil Sam ling Geophysical Survey <br /> Groundwater sampling Site Visit <br /> Surface Water Sampling o&M Visit <br /> Sediment Sampling Drum Sampling <br /> Air Sampling Surveying <br /> X Drilling Excavation <br /> Cam (lance Audit L]Other(above) <br /> operational Description of Site(attach site map if available); <br /> r <br /> Vacant portion of paperboard manufacturing facility <br /> Topography and General Environmental Setting: <br /> Flat <br /> Accessible by: <br /> X Highway ,. <br /> Paved Road <br /> Dirt Road <br /> Description of the Work Area: <br /> Vacant dirt lot. <br /> i <br /> I <br /> I <br /> 5-S Cogerl�NS/MSp.xls page 1 of 10 j <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.