My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 3 Geosyntec'�' <br /> Typical Monitoring Well Completion --DMW-5B consultants <br /> Site: Dopaco Area 800 West Church Street,Stockton,CA Date: Proposed <br /> Well ID: DMW-5B Drilling Method: Mud Rotary/Hollow Stem Auger <br /> Drilling Company: Boring Depth: —75 ft <br /> Drillers: Boring Diameter: 8-inches <br /> Geologist: Well Depth: —75 feet <br /> Well Diameter: 2-inches <br /> 3 ft. 110 <br /> Ground Elev. Well Construction: <br /> Material: Schedule 40 PVC <br /> Inside Diameter: 2-inches <br /> Locking Cap 0-3 ft. Screen Slot Size: 0.01-inches <br /> Screen Beg.: ---65 feet End: —75 feet <br /> Top of 3-o ft Sump Y / N <br /> Grout <br /> Type/Length: Factory-slotted PVC <br /> 58-61 ft Filter Pack: <br /> Type/Brand: Sand <br /> Bottom of <br /> Conductor 10-inch to 8- Amount Used: <br /> Casing 50 ft inch Diameter <br /> Placement Method: Tremmie <br /> Transition <br /> Seal: <br /> Top of Seal 61 ft Seal Len h <br /> Type/Brand: Bentonite pellets <br /> 2 ft(min. <br /> Amount Used: <br /> Seal Bottom 63 ft <br /> 2 ft Vol.Fluid Added: <br /> Top of Sand Above Set up Time: <br /> Screen 65 ft Screen <br /> Placement Method: Tremmie <br /> Grout: <br /> Type/Brand: Neat cement <br /> Screen Length Amount Used: <br /> ---10 ft Vol.Fluid Added: <br /> Placement Method: Tremmie <br /> Filter Pack <br /> Length Well Completion: <br /> —12 ft Above Grade/ Below Grade <br /> Guard Posts? Y / N <br /> Screen <br /> Bottom —75 ft Pad Size: --3-foot diameter <br /> Cover Type/Size: Depends on completion type <br /> Well Depth —75 ft <br /> Comments: Total depth and screen length for each well will be <br /> selected in the field,based on geology encountered. Wells will be <br /> Boring Depth —75 ft <br /> 2-inches screened in the B-zone aquifer encountered between—60 and 85 ft bgs. <br /> Well Diam. <br /> . � Geologist Signature: <br /> 8-inches <br /> Borehole Diam. <br /> Fig03_typical completion DMW-5B Page 1 of 1 January 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.