My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2900 - Site Mitigation Program
>
PR0516614
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2019 3:43:11 PM
Creation date
5/31/2019 3:23:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516614
PE
2960
FACILITY_ID
FA0012708
FACILITY_NAME
NEWARK SIERRA PAPERBOARD/ RECYCLING
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v` Eowl G.BROW JR. <br /> eorm�s <br /> 0 <br /> CALIIOW51A d=FWTAMa7111 Pff FOR <br /> OUO4uFi <br /> Water Boards <br /> Central Valley Regional Water Quality Control Board <br /> 10 February 2014 <br /> Leon Marineau Christian L'Orange <br /> Cascades Inc. Drinker Biddle & Reath LLP <br /> 471 Marie-Victorin 50 Fremont Street <br /> Kingsey Falls, Quebec, Canada JOA 180 San Francisco, CA 94105 <br /> DOPACO, INC., 800 WEST CHURCH STREET, STOCKTON, SAN JOAQUIN COUNTY <br /> REGIONAL BOARD CASE 391187 <br /> California Regional Water Quality Control Board, Central Valley Region (Central Valley Water Board) <br /> staff reviewed the Work Plan to Install Groundwater Monitoring Well DMW-5B (Work Plan). The Work <br /> Plan was received 30 January 2014, and submitted by Geosyntec Consultants (GC) for Cascades, Inc. <br /> for the Dopaco, Inc. (Case 1). In the Work Plan GC proposes installation of one deep monitoring well <br /> DMW-5B in the toluene source area to complete vertical delineation and to confirm previous groundwater <br /> impacts reported down to 85 feet below ground surface (' bgs). DMW-5B will be installed after the <br /> corrective action excavation of soil down to 30' bgs. is proposed to be installed DMW-5B will be <br /> constructed with a 50' conductor casing, , advanced through the backfill consisting of clean compacted <br /> soil and screened from 65' to 75' bgs. After advancing the conductor casing through the excavation fill <br /> material, soil will be logged in the boring at 5' intervals from surface down to 50' bgs and continuously <br /> logged from 50' to total depth of the boring at 75' bgs. We concur with the activities proposed by GC in <br /> the Work Plan with conditions as detailed below. <br /> We are aware Dopaco has been ordered to conduct investigation and cleanup of toluene, and any <br /> chemicals commingled with toluene, from the property at 800 West Church Street in Stockton by <br /> agreements specified in the Stipulated Injunction and Consent Decree per United States District Court, <br /> Eastern District of California Case 2:08-cv-02623-GEB-DAD, dated 20 April 2012. We concur with the <br /> activities proposed by GC in the Work Plan with the following conditions: <br /> 1. A shallow monitoring well should be installed near DMW-5B, to monitor the sand zone, indicated <br /> at 40' bgs in the CPT-13 logs. This sand zone is currently monitored by three existing monitoring <br /> wells to the east, west and south. The shallow well will confirm the effectiveness of the <br /> corrective action, provide the necessary monitoring data to show a declining trend in the <br /> groundwater pollution, and provide additional information on groundwater gradient and direction <br /> of groundwater flow in the sand zone. As an additional benefit, the shallow well should be <br /> capable of extraction of groundwater, if necessary. <br /> 2. Additional investigation consisting of monitoring wells to the north across Church Street is also <br /> necessary to confirm whether the groundwater plume is migrating and to confirm the <br /> downgradient extent of the groundwater plume. The off-site zones to be monitored may be <br /> adjusted after initial monitoring data is received from DMW-5B. We suggest that DMW-5B be <br /> sampled and analyzed by an onsite lab to provide a fast turn-around, so the drilling of the <br /> additional wells can be accomplished with a single mobilization. <br /> K#j%L E.LORaLer ScD,P.E.,amm r PAMetA C.CRm66N P.E.,SCEE,memunwe OFFICER <br /> 17026 SUR C—sm Qhs 11206,Ruldw Conkm CA 9WF I WWW.WaWb0WCh.0L9=Osntrslvs0s/ <br /> Q RGCYCLSO PAPNR <br />
The URL can be used to link to this page
Your browser does not support the video tag.