Laserfiche WebLink
Geosynte%- <br /> consultants <br /> 7. WORK PLAN <br /> Completing the LTCP evaluation process will be addressed by .an investigation <br /> consisting of groundwater, soil, and soil gas sampling as described below. <br /> 7.1 Pre-Investigation Activities <br /> Prior to the start of field activities, Geosyntec will perform the following: <br /> • Update the Site health and safety plan, as needed, in accordance with local, <br /> state, and federal requirements; <br /> • Obtain drilling permits from San Joaquin County, as required for CPTs, grab <br /> groundwater, soil, and soil gas sampling; <br /> • Confirm access and schedule with the property owner; and <br /> • Notify Underground Service Alert (USA) a minimum of two business days <br /> before any subsurface work and conduct a utility clearance using a private utility <br /> locator to identify subsurface utilities and other potential obstructions. Proposed <br /> investigation locations will be adjusted based upon the USA and private utility <br /> clearance. <br /> 7.2 Task 1• Perform CPT/Grab-Groundwater Investigation -to Delineate the <br /> Off-site (i.e., lateral)a4Vertical Extent of Toluene in Groundwater <br /> Task 1 consists of CPT and depth discrete groundwater sampling at the locations shown <br /> on Figure 7. The activities associated with this task are similar to those described in <br /> Section 2.2 of the Investigation Work Plan (Geosyntec, 2012c), excluding use of the <br /> Membrane Interface Probe(M.IP), and are presented below. <br /> CPT-13 Area Investigation Report and Work Plan 21 30 May 2013 <br />