Laserfiche WebLink
All written reports will include the following: <br /> • Name,address, and telephone number of the owner or operator(LLNL or LLNS). <br /> • Name,address, and telephone number of the RHWM Facility. <br /> • Date, time,and type of incident(e.g.,release, fire, or explosion). <br /> • Name and quantity of material(s) involved. <br /> • Extent of injuries,if any. <br /> • Assessment of actual or potential hazards to human health or the environment,when <br /> this is applicable. <br /> • Estimated quantity and disposition of recovered material that resulted from the incident. <br /> All written reports will be reviewed and forwarded to the appropriate regulatory agency by the <br /> EFA Manager. <br /> 12.2.3 Verbal and Written Notification to Agencies for Releases from a Permitted <br /> Hazardous Waste Management Facility <br /> Whenever a release occurs from a Facility requiring the implementation of the Contingency Plan, <br /> verbal notification to DTSC is required. In addition, a written report must be submitted within 15 <br /> days. <br /> All verbal and written reports include the following: <br /> • Name and telephone number of the reporter. <br /> • Name and address of the Facility. <br /> • Date, time,and type of incident(e.g.,release or fire). <br /> • Name and quantity of material(s) involved, to the extent known. <br /> • Extent of injuries,if any. <br /> • Possible hazards to human health or the environment outside the LLNL Site 300 facility <br /> boundaries. <br /> • Actions taken and status of Facility. <br /> DTSC must also be informed that no waste that may be incompatible with the released material <br /> is transferred,treated,stored, or disposed of until cleanup procedures are completed and that all <br /> emergency equipment listed in the Contingency Plan is cleaned and fit for its intended use before <br /> operations are resumed. <br /> 12.2.4 Department of Energy Reporting <br /> All verbal and written notifications to DOE for hazardous and toxic releases are completed in <br /> accordance with LLNL Implementation Procedure for Reporting Occurrences to DOE(UCRL- <br /> MA-133867). <br /> LLNL Site 300 Contingency Plan 33 January 2019 <br />