Laserfiche WebLink
State of California <br /> Well Completion Report <br /> Form DWR 188 Submitted 5/29/2019 <br /> WCR2019-007282 <br /> Owner's Well Number Date Work Began 05/22/2019 Date Work Ended 05/23/2019 <br /> Local Permit Agency San Joaquin County Environmental Health Department <br /> Secondary Permit Agency Permit Number 39594 Permit Date 05/07/2019 <br /> Well Owner(must remain confidential pursuant to Water Code 13752) Former Use <br /> Name BMW DEVELOPMENT, Penelope Cornish Activity Destroy <br /> Mailing Address 158 N. Main Street Former Use Water Supply <br /> City Manteca State Ca Zip 95336 <br /> Well Location <br /> Address 240 E Edison ST APN 223-142-03 <br /> City Manteca Zip 95336 County San Joaquin Township 01 S <br /> Latitude 37 48 22.0507 N Longitude -121 12 51.3831 W Range 07 E <br /> Section 33 <br /> Deg. Min. Sec. Deg. Min. Sec. <br /> Baseline Meridian Mount Diablo <br /> Dec. Lat. 37.8061252 Dec. Long. -121.2142731 <br /> Ground Surface Elevation <br /> Vertical Datum Horizontal Datum WGS84 Elevation Accuracy <br /> Location Accuracy Location Determination Method Elevation Determination Method <br /> Borehole Information Water Level and Yield of Completed Well <br /> Orientation Vertical Specify Depth to first water (Feet below surface) <br /> Drilling Method Drilling Fluid Depth to Static <br /> Water Level (Feet) Date Measured <br /> Total Depth of Boring Feet Estimated Yield* (GPM) Test Type <br /> Test Length (Hours) Total Drawdown (feet) <br /> Total Depth of Completed Well 26 Feet *May not be representative of a well's long term yield. <br /> Destruction Details: <br /> Dug down cut off casing 4ft.pumped Bentonite bottom to top,capped with cement. <br /> Other Observations: <br /> Form DWR 188 rev. 12/19/2017 Page 1 of 2 <br />