Laserfiche WebLink
v <br /> A S S O C I A T E S I N C <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered.Professional Engineer.. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) contained in Attachment 1 and Quality Control/Quality Assurance Plan <br /> contained in Attachment 2. <br /> Projected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities. ATC will <br /> notify PHS/EHD at least 48 hours prior to beginning any field activities. The summary report will <br /> be submitted to PHS/EHD approximately four to five weeks after the completion of field <br /> activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us-at (209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> lll.vt <br /> �01.1 Mlt, <br /> Drew Van Allen r �SIr��q <br /> Staff Scientist < � ;1EANNE l F� <br /> LAj f4oe Q1.17 <br /> 410 <br /> Jeanne Homsey, P.E. �; F-XP• - — � <br /> Registered Engineer No. C47410 CIVIL { <br /> Attachments <br /> cc: Mr. Paul Van Dyken, lei&S Irrigation <br /> wA14981\reporls\wkpwe1.doc 4 <br />