My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
215
>
3500 - Local Oversight Program
>
PR0544559
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 3:05:12 PM
Creation date
6/13/2019 2:54:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544559
PE
3528
FACILITY_ID
FA0009944
FACILITY_NAME
N&S IRRIGATION
STREET_NUMBER
215
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25906072
CURRENT_STATUS
02
SITE_LOCATION
215 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Sample Analysis <br /> Selected samples will be immediately placed on .ice and delivered under chain-of-custody <br /> documentation to American Environmental Network (AEN), a State=certified laboratory, for <br /> analysis. Soil samples will be analyzed for total petroleum hydrocarbons as gasoline (TPHg) <br /> using EPA Method 8015 Modified, benzene, toluene, ethylbenzene, and xylenes (BTEX) using <br /> EPA Method 8020, an&total lead. Groundwater samples will be analyzed for TPHg, BTEX, <br /> oxygenate fuel additives using EPA Method 8260, and total lead. <br /> Report Preparation <br /> Upon completion of all field activities, a summary report will be prepared for submittal to . <br /> PHS/EHD. Smith Technology will prepare a report that will include a description of all field <br /> activities, laboratory analytical results, boring logs, .and recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan(SSP) is contained in Attachment <br /> 1 and a Quality Control/Quality.Assurance.Plan is contained in Attachment 2. All field work will <br /> be completed in accordance with these plans. <br /> I <br /> Projected Schedule <br /> Once approval of this workplan has been received, Smith Technology will schedule drilling <br /> activities. It is anticipated the drilling- will be completed in one day and drilling has been <br /> tentatively scheduled for November 19, 1997. Smith Technology will notify PHS/EHD at least 48 <br /> hours prior to beginning any field activities. The summary report well be submitted to <br /> PHS/EHD <br /> approximately four to five weeks after the completion of field activities. <br /> w:\14981\reports\wkp.doc 3 <br /> • <br /> SN�TH <br />
The URL can be used to link to this page
Your browser does not support the video tag.