Laserfiche WebLink
M <br /> 09 January 1998 <br /> AGE-NC Project No 96-0235 <br /> Page 6 of 6 <br /> � r <br /> • Installation of three additional ground water_monitoring well"§, two north of)MW-2 in the ' <br /> iapparent down-gradient direction and a shallowlcompleted well near MW=2��The two <br /> down-gradient wells should be dual completed mo orator both the current high water level, <br /> _ - as monitored In`wells MW-4 and MW-5,and the former lower water level monitored in wells <br /> MW-1 and MW-2 Installation of a shallow completion well near MW-2 will yield reliable <br /> hydrocarbon concentrations in shallow ground water under the current regime of high ground <br /> water elevation Proposed well placement_ s are illustrated on Figure 2 <br /> • Continued quarterlymonitoring of the ground water monitoring wells on-site should be <br /> performed The next monitoring should be performed in February 1998 or following <br /> installation of the additional monitoring wells <br /> 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> . analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> at the site for the purpose of this investigation was made from review of previous consultants reports <br /> and a limited number of available data points (ground water samples) and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br />' professional recommendations contained in this report <br /> v <br /> a <br /> i <br /> 1 <br /> s <br /> r <br /> Ad►anced GeoEntiron mental,Inc <br /> o d <br /> ` i J <br />