Laserfiche WebLink
• BIDDING COST SCHEDULE <br /> PLEASE IDENTIFY ALL POSSIBLE COSTS you feel will be needed <br /> to fulfill the objective as stated in the bidding requirements. <br /> If the amount is unknown, give a rough estimate. Proposed <br /> drilling sampling, well installation material ' s, equipment, <br /> and procedures should be described in detail on a separate <br /> sheet. <br /> 1) Permitting and Pre-field Activities <br /> Professional Services <br /> Permit Fees <br /> 2) Drilling of four Soil Borings, Two Monitoring Well <br /> Installations and Hydropunch Sampling in two locations. <br /> Professional Services <br /> Miscellaneous Materials <br /> Drilling Contractor & Crew <br /> Laboratory Analysis <br /> (12 Soil Samples: BTEX/TPH-G, TPH-D, TRPH) <br /> • 3) Monitoring Well Development and Sampling <br /> Professional Services <br /> Equipment and Materials <br /> Laboratory Analysis <br /> (4 Groundwater Samples: BTEX/TPH-G TPH-D, TPH-K, and TRPH) <br /> 4) Composite Sampling of Previously Excavated Soil <br /> Professional Services <br /> Equipment and Materials <br /> Reporting <br /> 5) Field Screening/confirmation Sampling During Further <br /> Excavation <br /> Professional Services <br /> Equipment and Materials <br /> Laboratory Analysis <br /> (9 Soil Samples: BTEX/TPH-G, TPH-K <br /> Reporting <br /> 6) Composite Sampling of Soils Excavated During Proposed <br /> Excavation <br /> Professional Services <br /> Equipment and Materials <br /> Laboratory Analysis <br /> (9 Soil Samples: BTEX/TPH-G, TPH-K <br /> Reporting <br />