Laserfiche WebLink
5) Field Screening/confirmation Sampling During Further <br /> Excavation <br /> UNIT NO.UNITS COST/UNIT $ TOTAL <br /> SUB-TOTAL <br /> 6) Composite sampling of Soils Excavated During Proposed <br /> Excavation <br /> UNIT NO.UNITS COST/UNIT $ TOTAL <br /> SUB-TOTAL <br /> 7) Materials Testing/Inspection of Excavation Backfill <br /> Materials <br /> • UNIT NO.UNITS COST/UNIT $ TOTAL <br /> SUB-TOTAL <br /> 8) Reporting <br /> UNIT NO.UNITS COST/UNIT $ TOTAL <br /> SUB-TOTAL <br /> 9) Additional (5) Monitoring Events (1 Year for 5 Wells Total) <br /> UNIT NO.UNITS COST/UNIT $ TOTAL <br /> • <br /> SUB-TOTAL <br /> TOTAL BID $ <br />