My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001633
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
639
>
3500 - Local Oversight Program
>
PR0544513
>
ARCHIVED REPORTS XR0001633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 12:12:22 PM
Creation date
6/14/2019 10:49:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001633
RECORD_ID
PR0544513
PE
3528
FACILITY_ID
FA0024115
FACILITY_NAME
WEST CLAY PROPERTY
STREET_NUMBER
639
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14707110
CURRENT_STATUS
02
SITE_LOCATION
639 W CLAY ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"1 h"F� KLEINFELDER <br /> File No 20-3769-01 <br /> March 16, 1994 <br /> minute (gpm) depending on recharge rate and casing size. Development continues until the <br /> discharge runs relatively clear of fines Approximately 5 to 10 well volumes generally are <br /> removed from each monitoring well Discharge water is stored in 55-gallon drums and left on <br /> site for later discharge or disposal by the client, depending on laboratory results. <br /> A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> in a trisodium phosphate or lab grade detergent solution and rinsed in distilled water or steam <br /> cleaned prior to use in the next monitoring well. <br /> A-3.4 Well Survey <br /> The locations of soil borings and monitoring wells and the elevation of the top of the PVC <br /> casings will be surveyed and tied into permanent markers, if readily available. Survey accuracy <br /> is 0.1 foot for the "x" and "y" coordinates and 0.1 foot for the "z" coordinate. The depth to <br /> static groundwater is measured from a set location at the top of the PVC casing. The depth of <br /> water is then subtracted from the elevation of the top of the well casing to provide a groundwater <br /> elevation for each monitoring well location. <br /> A-4 GROUNDWATER MONITORING <br /> A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows- <br /> 1. <br /> ollows-1. The wells are opened and allowed to equilibrate with the atmosphere. <br /> 2. The water level probe is decontaminated in a trisodium phosphate wash, followed by <br /> a distilled water rinse, prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level meter. Depth-to- <br /> water is generally measured from a surveyed mark on the north nm of the PVC well <br /> casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> Copyright 1994 Kloinfelder, Inc Pago 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.