Laserfiche WebLink
4. <br /> KLEINFELDER <br /> Each sample is individually labeled The label includes Kleinfelder's name,job number, the date <br /> and time the sample was collected, the employee number of the individual who performed the <br /> sampling, and a unique five-digit sample identification number A custody seal may be placed on <br /> the sample in such a way that any attempt to tamper with the sample is easily visible <br /> A-2.4 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory A Kleinfelder chain-of-custody form <br /> accompanies the cooler The chain-of-custody form includes Kleinfelder's name, address, and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, and the analyses for which the samples are being submitted, if any When the <br /> samples are delivered, the chain-of-custody form is signed by each person who handles the <br /> samples, including all Kleinfelder employees and the receiving employee of office sample control <br /> or the analytical laboratory <br /> A-2.5 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring In addition, sampling equipment is cleaned with a <br /> • tnsodium-phosphate or laboratory detergent wash and rinsed with distilled water pnor to <br /> collecting each soil sample <br /> A-2.6 Soil Cutting Disposal <br /> Drill cuttings are placed in 55-gallon drums or on top of and covered by polyvisquene for storage <br /> The soil is left on site for disposal by the site owner If requested, Kleinfelder can coordinate <br /> disposal of soil and water after analytical results are available <br /> A-3 C;ROUNDWATERT L <br /> A-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater momtonng wells are as follows <br /> * The monitoring wells will have casings consisting of 2-inch inside diameter, flush- <br /> threaded joint, Schedule 40 PVC pipe These wells will be constructed in 8-inch <br /> diameter bonngs <br /> • Well screen sections will be perforated with 0 010- or 0 020-inch factory-cut slots The <br /> . perforation sieve openings are assessed (and modified if required) after the bonngs are <br /> logged, and if warranted, a sieve test has been performed and the results received <br /> ETH and WC194 <br /> Copyright 1994 Kleinfelder Inc Page 2 of 5 <br />