Laserfiche WebLink
• <br /> Advanced GeoEnvironmental, Inc <br /> Site Health and Safety Plan <br /> Page 4 of 7 <br /> G.O. ON-SITE WORK PLANS <br /> Work party(les) consisting of two persons will perform the following tasks <br /> Project Team Leader: Task: <br /> Kevin McKibben Over site <br /> Work Party ##1: Task. <br /> Geo Probe Operator Advance borings <br /> Technician (if nec ) Clean equipment <br /> . The works party(ies) were briefed on the content of this plan at the site on <br /> 7 0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used <br /> Hand gripping throat Out of air, can not breath <br /> Grip partner's wrist or both hands around waist Leave area immediately <br /> Hands on top of head Need assistance <br /> Thumbs up OK, I am alright, I understand <br /> Thumbs down No, negative <br /> AGE NC SHSPNv 2 o/remn-46 <br />