Laserfiche WebLink
t <br /> N <br /> KLEIN FELDER <br /> File No. 20-3769-01 <br /> March 16, 1994 <br /> bottom of the boring. The ends of the bottom (third) tube are covered with Teflon and sealed <br /> with tight fitting plastic caps. 1 <br /> Each sample is individually labeled. The label includes Kleinfelder's name,job number, the date <br /> and time the sample was collected, the employee number of the individual who performed the <br /> sampling, and a unique five-digit sample identification number. A custody seal may be placed <br /> on the sample in such a way that any attempt to tamper with the sample is easily visible. <br /> A-2 4 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes KIeinfelder's name, address, and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, and the analyses for which the samples are being submitted, if any. When the <br /> samples are delivered, the chain-of-custody form is signed by each person who handles the <br /> samples, including all Kleinfelder employees and the receiving employee of office sample control <br /> or the analytical laboratory. <br /> A-2 5 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to dnlling each boring. In addition, sampling equipment is cleaned with a <br /> tnsodium-phosphate or laboratory detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> A-2.6 Soil Cutting Disposal <br /> Dnll cuttings are placed in 55-gallon drums or on top of and covered by polyvisquene for <br /> storage The soil is left on site for disposal by the site owner If requested, Kleinfelder can <br /> coordinate disposal of soil and water after analytical results are available <br /> A-3 GROUNDWATER WELL INSTALLATION <br /> A-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows <br /> • The monitoring wells will have casings consisting of 2-inch inside diameter, flush- <br /> threaded point, Schedule 40 PVC pipe. These wells will be constructed in 8-inch <br /> diameter borings. <br /> Copyright 1994 Klainfalder, Inc Page 2 of 3 <br />