Laserfiche WebLink
J <br /> 24 December 2013 <br /> AGE Project No. 01-0887 <br /> Page 2 of 2 <br /> MW-1 through MW-11 were removed by over- rilling he r�ells to one feet greater than their <br /> total depths of 19 feet bsg (MW-1, MW-2x M -3, MW- 0 feet bsg (MW-10Y25 feet bsg <br /> (MW-6, MW-7, MW-8, MW-9, MW-11)and 55 feet bs ith 8-inch diameter hollow stem <br /> augers. Following over-drilling, each well was grouted to near surface using a Portland <br /> cement grout mixture, well boxes were removed and the surfaces at each location were <br /> completed with native soils. <br /> On 23 December2013, eleven drums,containing waste derived from the well destructions, <br /> were removed by Instrat Inc. of Rio Vista, California. Waste was properly hauled and <br /> disposed of under uniform non-hazardous waste manifest, which has been included in <br /> Appendix B. <br /> If you have any questions or require further information, please contact our office at (800) <br /> 511-9300. <br /> Sincerely, <br /> O%AL GEp�O <br /> Advanced GeoEnvironmental, Inc. <br /> ';)tx • * Nti_ 7473 <br /> Daniel Villanueva William R. Little ;' <br /> Project Geologist Senior Project Geologist9 °F onG��°� <br /> California Professional Geologist No.7473 <br /> cc: . Mr. Jim Barton, CRWQCB <br /> Ms. Sandi Sarale, Sarale Farms <br /> I <br /> Advanced GeoEnviromnental,Inc. <br />