My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLOVER
>
835
>
3500 - Local Oversight Program
>
PR0544565
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2019 2:09:08 PM
Creation date
6/14/2019 1:57:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544565
PE
3528
FACILITY_ID
FA0025332
FACILITY_NAME
RALPH HAYES AND SON INC
STREET_NUMBER
835
Direction
W
STREET_NAME
CLOVER
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
835 W CLOVER RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Project No. E6576.001 Additional Groundwater Sampling/W. Clover Rml'ti 22 March 1995 <br /> RECOMMENDATIONS <br /> 1 - The results of analysis of the borings, monitor well, and confirmatory samples given E <br /> in Tables 1 through 3 indicate that only insignificant levels of contamination remain in the area <br /> where the three USTs were removed. These have been quantified herein. It is, therefore, the <br /> opinion of TERRASEARCH, ine., that closure be permitted at the Site after the actions below <br /> are completed. <br /> l <br /> Final Cleanup: <br /> Clean import sand and gravel will be used to fill the excavation to above the water <br /> rtable. The approximately 100 cubic yards segregated clean overburden stockpile will then be <br /> L <br /> placed in the excavation. During the backfill operation, the excavation will be dewatered; and <br /> a backhoe will be used to remove as much of the below-water trim and sluff(see Figure 3) as <br /> isp racticable. This material will be added to the "contaminated" stockpile. The backhoe, or <br /> a small loader/dozer will then push the backfill material into the excavation, working from the <br /> sides. Once the excavation has been backfilled above groundwater level, the loader or backhoe <br /> can break back the bank so that the loader, with a vibrating roller, can compact the remaining <br /> material, as the import and clean original sand is brought up to grade in layers. <br /> f <br /> Disposal of Stockpile of "Contaminated" Soil: <br /> j <br /> The existing 200 cy of material, as well as up to 30 cy of material added from the <br /> backfill operation described above, contains very little diesel. The first (most westerly) <br /> approximately 100 cy of material is almost all original sandy backfill material. The remainder <br /> consisted of randomly mixed sand and clay. Since only the westerly portion of this stockpile, <br /> as defined by the dashed line in Figure 5, showed any contamination, this portion shall be <br /> hauled by a certified hauler to either the Forward landfill in Modesto or the Vasco Road <br /> landfill near Livermore. The easterly portion shall be spread on the surface of the Site in a <br /> layer not exceeding 2 inches in thickness. <br /> Page 11 <br /> TERRASEARCH, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.