Laserfiche WebLink
APPENDIX A - REPORTING 30 August 1,091 <br /> REPORTING - Each report is to summarize previous <br /> reports, as necessary and available, to <br /> Both general and report specific requirements assure that it may be reviewed indepen- <br /> are discussed below. General requirements dently. It is not acceptable to reference <br /> protect the interests of the tank owner and a graph, table, borehole log, etc., in a <br /> ti assure the regulating agencies that another report (at times not even avail- <br /> commitments have been made. These include able). <br /> Tank Owner Commitment, comprehensive <br /> r requirements and monitoring well installation. - Technical assistance for completing <br /> Report specific requirements guide the tank reports and workplan may be provided <br /> owner in preparing the report phase for LIA by environmental consultants in the <br /> and Regional Board review. private sector. Reports, documents, and <br /> plans which contain engineering, <br /> All reports and workplans prepared for the geology, and/or geophysical information <br /> Regional Board are to be submitted to both the must be prepared under the direction of <br /> Regional Board and LIA for review and ap- properly licensed individuals in the State <br /> proval. Interim remediation shall not of California (Sections 6735, 7835, and <br /> commence without LIA or Regional Board 7835.1 of the California Business and <br /> approval. Professions Code). Responsibility for <br /> the technical information is indicated by <br /> GENERAL REQUIREMENTS the signature and/or stamp of the seal of <br /> the licensed individual. More than one <br /> • Tank Owner Commionent - A cover letter from signature and/or seal may be required <br /> the tank owner (or Responsible Party designat- where more than one professional spe- <br /> ed by the tank owner) is to be submitted with cialty is included in the technical docu- <br /> all reports and workplan stating: meat submitted. <br /> Agreement or disagreement with the - All borehole and monitoring well logs, <br /> conclusion and recommendation in the excavation procedures, and soil/ground <br /> report or workplan; water samplings are to be certified by a <br /> The accuracy of the report and that Registered Geologist, Certified Engi- <br /> Local Implementing Agency or Regional neering Geologist, or Registered Engi- <br /> Board guidelines have been followed; neer. (This assures the regulatory agen- <br /> - The time lines and projected schedule cies of the integrity of the work and <br /> for the next phase of investigation; and protects the tank owner's interests.) All <br /> Whether (and why) a meeting is subsurface geologic data from boreholes, <br /> requested to discuss options. monitoring wells, trenches, etc. are to be <br /> displayed on geologic cross sections. <br /> Cornprrhauire <br /> Monitoring Well IInstallad n: Individual well <br /> Reports and workplan are to have diagrams are to represent the completed well <br /> pagination. accurately and show or describe: <br /> Time schedules are to be included - Types and quantities of materials placed <br /> showing weeks and months to comple- in the borehole; <br /> tion with key steps shown. <br /> rl � A-2 <br />