Laserfiche WebLink
. I <br /> 64: <br /> Q <br /> T <br /> dip tiSERVICE <br /> Pete Wilson <br /> J <br /> t UN 27 H 11.€1: 29 <br /> Governor <br /> 1 A 20, 1997, <br /> ;..: <br /> ater <br /> es Ms.Mary Clarke <br /> _,trol Board Estate Of Fredrick D. Clarke <br /> f <br /> Vision of 352 Deer Hollow . <br /> glean Water Napa, CA .94558 <br /> )Programs - <br /> M-iling aeares5. PRE-APPROVAL OF CORRECTIVE ACTION COSTS, <br /> CLAIM NO. 7752, <br /> P.O.Box 944212 SITE ADDRESS: 729 COMMERCE ST.,S,STOCKTON,CA 95203 <br /> Sacramento,CA <br /> 942442120 <br /> I have reviewed your request,received on June 9; 1997,for pre-approval of corrective action costs;I <br /> 2ola T street of the"Cost Pre- ` <br /> Suite Street <br /> will place these documents in your file for future reference. I have included a copy <br /> Sacramento,CA lease use this form in the future for requesting pre-approval of corrective <br /> 95814 Approval Request"form;p <br /> (916)227-4374 actions costs. <br /> FAX(916)227-4530 <br /> World Wide Web With the following provisions,the total cost pre-approved as eligible for reimbursement for completing <br /> http://wvAv.s`'''r°b.°&. the re-sampling of groundwater monitoring wells requested by the San Joaquin County EBD (County), <br /> funanome.htm is$�4. (_The total amount approved for reimbursement�[through Re�nest No 3;for work our site <br /> that has been directed.and approved by the County is $56,052.) <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all reasonable <br /> and necessary corrective action costs for work directed�and approved by the County will be eligible <br /> for reimbursement per the terms of your Letter of Commitment at costs consistent.with those pre- <br /> approved in this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs for corrective action must meet the requirements of <br /> Article4l, Chapter A.Underground Storage Tank.Regulations. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> It is my opinion that it is unnecessary to obtain three.bids for this scope of work;the Fund's three <br /> bid requirement is waived for this scope of work.. ik <br /> • If a different scope of work becomes necessary,then you nmust request pre-approval of costs for the <br /> new scope of work. <br /> • Although I have referred to the Clearwater Group,Inc.'s proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract:the State of California cannot <br /> compel you to sign any specific contract. This letter pre-approves the costs as presented in the <br /> proposal dated June 9, 1997 by, Clearwater Group,Inc. for conducting the work approved by the <br /> County. <br /> I <br /> Our mission is to preserve and enhance the.quality of California's water resources;and <br /> (� Recycled Paper ensure their proper allocation and efficient use for the bene)lt ofpresent and future generations. <br /> � i <br />