Laserfiche WebLink
1.0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map Figure 1). This SSP <br /> addresses the expected potential hazards that may be encountered during this project <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc. (Clearwater) <br /> employees and any subcontractors working for Clearwater at the job site. All personnel <br /> working for Clearwater, including subcontractors, at the job site must read this SSP, and <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area. <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig. 1, site map on Fig. 2) <br /> Previous Site Operations: _&MO (M CK-dt- From: unx. To: /942 or 14ka„ <br /> woa�rw/iw From:/ATZo- To: <br /> Is site currently active? <& No AkIr <br /> Work surface is: Asphalt Concrete Gravel/D' <br /> ASTs/USTs present?: Yes (2� Location: <br /> Number of USTs removed: 2-Location:S6&SA &n Date removed: 3/ff Z <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil: , Location: k Am eXtaY• 6 <br /> Maximum TPH concentration in soil: inca eo?,bj Location: " •• " <br /> 23 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site: 4+' <br /> Maximum dissolved benzene concentration to date: Well: <br /> Latest maximum dissolved benzene concentration: _J Well: <br /> 2.4 Remediation <br /> Previous remedial system operation: From To: <br /> From To: <br /> Active remediation AteNF <br /> Number of SATE wells: AS wells: GWE wells: <br /> Other (trenches, sumps,..): <br /> Remediation equipment on site: <br />